My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-15_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-09-15_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:42 PM
Creation date
10/2/2014 9:39:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/15/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C 1996083 Technical Revision No. 87 Page 3 of 5 <br />Task description: <br />Site: Bowie No. 2 Mine <br />TRUCK/LOADER TEAM WORK <br />Haul Material from cover pile east of Pond F to Pond D <br />Permit Action: Technical Revision 87 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 367 State: Colorado <br />Date: 6/30/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Generic 10 -12 c , 6x4 <br />- Loader: CAT 914G <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />NA <br />NA <br />Abbreviation: None <br />Filename: C083 -367 <br />Shift basis: Iffier day <br />Cn%t Rreakdnwn- Tnlck/Loader Team Sunnort Eauinment Maintenance EQUiDment <br />Total work team cost/hour: $227.15 <br />MATERIAL OUANTITIES <br />Initial volume: 783 CCY Swell factor: 1.165 <br />Loose volume: 912 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.21 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.65 <br />$12.24 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$63.40 <br />$25.68 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$37.13 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$76.05 <br />$75.05 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $227.15 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $227.15 <br />MATERIAL OUANTITIES <br />Initial volume: 783 CCY Swell factor: 1.165 <br />Loose volume: 912 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.21 LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.