Laserfiche WebLink
Rule 2.05.4 -- Reclamation Plan <br />1) The Reclamation Map (Map 29) is proposed to be revised. The revised map does not include <br />pertinent information that is on the currently approved Map 29. For example, on portions of the <br />affected area, the map does not include; cross sections, adequate post mine contours, post mine <br />land use designations and dates of disturbance. Either add the currently approved information to <br />the revised map or keep the currently approved map and add the proposed revised map to the <br />permit under a different title and designation (Map 29a for example). <br />2) On the currently approved Reclamation Plan Map; Map 29 it is difficult to determine which areas <br />will be reclaimed to the following post mine land uses: RangelandlWildlife, Cropland and Pasture <br />Land. On the revised map discussed on the previous item, clearly delineate which portions of the <br />affected area will be reclaimed to the designated post mine land use. <br />3) Revised Page 2.05 -31.2 discusses reclamation of the Utah Tract. The currently approved narrative <br />for this section discusses the post -mine land use and seed mixture to be used for this area <br />(rangelandlwildlife) and discusses the mulching rate and crimping requirement. The proposed <br />revised page leaves out this information and simply indicates the MCM has applied for a Phase 1 <br />and 2 bond release for these parcels and plans to sample the areas for final Phase 3 bond release <br />in the future. Please revise this page to include the reclamation information. <br />a. MCM Response to items 2 through 3: In order to provide all relevant information, <br />MCM will retain the existing Reclamation Plan Map, and add the updated Reclamation <br />Map as Map 29a. As appropriate, text references have been modified to reference both <br />maps. Page 2.05 -31.2 has been revised to include the previously provided information, and <br />the revised page is included with these responses. <br />b. DRMS Response: <br />i. Item #1 is resolved. <br />ii. Item #2 was not addressed. This item remains outstanding and will need to be <br />addressed prior to the approval of TR36 and RN6. <br />Respo: Map 29 has been reviewed and compared with the Pre - Mining Land Use Map <br />(Map 3). Postmining land -use designations have been added to Map 29 which generally <br />reflect restoration of mine disturbance areas to the pre - mining use. It should be noted. <br />however., that there may be some, mbi u.t in the pre- mining use designations, and the <br />designated postses refle nticipated future use for the disturbed and <br />surroundireas <br />W. Item #3 is resolved. <br />Rule 2.05.6 — Mitigation Of the Impacts of Mining Operations <br />1) On revised page 2.05 -38; MCM provides the Theim equation. There are two "R" variables in the <br />equation. The variable for the radius of a point on cone of depression should be a lower case "r ". <br />Please correct this variable and submit a revised page. <br />a. MCM Response: Page 2.05 -38 has been revised to correct the noted typo, and the revised <br />page is included with these responses. <br />b. DRMS Response: This item is resolved. <br />