Laserfiche WebLink
revise the reclamation cost estimate, and will provide the revised estimate for MCM's review. Once the <br />updated reclamation cost estimate is finalized, a copy will be inserted in Exhibit 25. If the Division <br />incorporates the relevant historical information from the current cost estimate in this update, it will replace <br />the current cost estimate in Exhibit 25, otherwise, the current cost estimate will be retained as relevant <br />historic background, and the updated cost estimate will be added to Exhibit 25. <br />b) DRMS Response: The Division has reviewed the updated Table 56, Map 25 and the "Mine Facilities" <br />discussion in Section 2.05.3 of the PAP and identified several issues that will need to be addressed. Please <br />address the items below: <br />i) Please depict and label all of the rock dust tanks on Map 25. This should include the rock dust tanks in <br />the empire village, the two at the shop area and the one said to be located in the No. 5A Portal. <br />ii) Either add more detail to Map 25 or create a separate map of the Coal Handling/Storage Facilities listed <br />on proposed revised page 2.05 -9. Some items are identified on the revised map and others are not. <br />Please clearly depict and label each of the items listed. <br />iii) Please depict and label the No. 5 and 5a Mine Fresh Water System and its components (Two wells, <br />water treatment system and No. 5 Mine Water Pump) on Map 25. <br />iv) Please depict and label the Red Rock Crusher site on Map 25. <br />v) Please depict and label all of the storage yards identified as "Ancillary Facilities ". <br />vi) Please add the 100,000 gallon water tank to revised Table 56. <br />Response: The rock -dust tanks were not shown on Map 25 because they have now all been removed from <br />the site. The referenced map and text were reviewed for consistency, and revised as appropriate. Map 25 <br />has been revised and updated to show the freshwater system components, and the Red Rock Crusher site. <br />The "ancillary facilities" category is a "catch -all" which includes miscellaneous small areas associated with <br />the other labeled mine facilities, involves very limited disturbance, all of hided within the <br />inap _ed_mine disturbance areas. Therefore it is neces x ly identify and <br />I are'he 100,000- n <br />The Division is conducting a reclamation cost estimate based on the revised information. Per our discussion on <br />Monday, the Division is forwarding this letter in advance of the estimate so you can begin working on a response. I <br />will forward the updated cost estimate as soon as it is completed. <br />The decision date for TR36 is September 12, 2014 <br />W. If you need additional time to address the Division's concerns please request an extension of the Decision <br />date. If you have any questions feel free to contact me. (303) 866 -3567, extension 8120. <br />