Laserfiche WebLink
i. Under the Yampa River section, please revise the language to indicate that development <br />mains and sub -mains have been driven under the Yampa River AVE The proposed <br />language of this section indicates these operations occurred under the Williams Fork River <br />AVE <br />ii. Under the Williams Fork River section, please indicate what mining and development <br />work has been done under this AVF and how it has been protected from subsidence. <br />MCM Response #2: Page 2.05 -53 has been revised to clarify historic mining under the Williams <br />Fork River and associated AVF and address subsidence considerations, and the revised page is <br />included with these responses. <br />d. DRMS Response #2: This item is considered resolved. <br />29. The discussion of mining under the alluvial valley floors within the Williams Fork Mines' permit area, <br />beginning on permit page 4.01 -13, only includes information for the first permit term. The Williams Fork <br />Mines is currently in its fifth permit term. Please update the discussion of mining activities under the <br />Yampa River (Big Bottom) and Williams Fork River Alluvial Valley Floors for all permit terms up to and <br />including the current permit term. If MCM provides a Permit Revision with a new mine plan, this <br />section of the permit will need to be updated with the future (planned) mining information as well. <br />a. MCM Response: The specific Permit text discussion for alluvial valley floors has been reviewed <br />and updated, as appropriate, to reflect current status and conditions. Copies of the revised Permit <br />discussion accompany these responses for replacement in the PAP. <br />b. DRMS Response: <br />i. Revised section 4.24 on page 4.01 -13 discusses the operations on the Yampa River <br />Alluvial Valley Floor area. The revised wording indicates that no underground mining has <br />been done or is planned in this area. This statement is inaccurate and in conflict with <br />permit section 2.06.8 (page 2.06 -3). It appears partial extraction has occurred under the <br />Yampa River AVF of the "F" seam. Also potential development is planned in this area as <br />depicted on Map 23 and 24 of both the "F" and "E" seam for the life of the mine. Please <br />revise this information. <br />ii. Permit Section 2.06.8 needs to be updated to account for subsequent mining and <br />development since the first permit term. <br />c. MCM Response #2: Permit sections 2.06.8 and 4.24 have been reviewed and revised to clarify <br />historic mining under the Yampa River and associated AVF, address subsidence considerations, <br />and update the information to reflect mine development to date. The revised pages are included <br />with these responses. <br />d. DRMS Response #2: <br />i. Item 29(b)(i) is resolved. <br />ii. Item 29(b)(ii) is resolved. <br />Reclamation Cost Estimate; <br />MCM provided updates to Table 56, Map 25 and the "Mine Facilities" discussion in Section 2.05.3 of the PAP <br />to provide information to update the reclamation cost estimate for TR36IRN6. Their response to the <br />Division's first adequacy review concerns is below. <br />a) MCM Response: Table 56, Map 25, and the "Mine Facilities" discussion in Section 2.05.3 of the PAP <br />have been reviewed, updated, and revised for consistency and to reflect the current disposition and status of <br />all major mine structures and facilities. Copies of these revised materials are included with these <br />responses. It is MCM's understanding that the Division will utilize this updated information to review and <br />