Laserfiche WebLink
Exhibit E <br /> Reclamation Plan <br /> The top 6-12" of native topsoil will be stripped and stock piled before mining operations are to <br /> begin. All stripped topsoil will be relocated to the outer 100' of Pit boundaries for storage. <br /> Topsoil stockpiles will be shaped and seeded with seed mix in (E-2) in order to minimize and <br /> prevent erosion. <br /> All slopes will be established with a minimum 31-1:1 V final grade. Native topsoil will be applied <br /> over all disturbed areas at a depth of 6-12". Once finish grade has been established, tilling of <br /> chiseling will occur in order to loosen up the soil. Drill seeding will be used to apply the seed. <br /> After seeding, straw will be mulched and spread over the seeded area with crimping to hold it in <br /> place. <br /> The current use of the property is agricultural grazing land. The seed mix proposed is a mix of <br /> native grass and shrubs with additional seed to improve the grazing properties of the affected <br /> land. <br /> E-1 <br />