Laserfiche WebLink
Pit wall will be established at a 3:1 slope and reclamation will occur as progression <br /> allows. Phase five is anticipated to take three years. When all inventory and stockpiles <br /> have been removed, Pit floor will be reclaimed. <br /> f) The surface layer is mainly stony sandy loam to a depth of 14"to 26". This layer covers <br /> a substratum of gravel, cobbles and boulders to a depth of 30' to 45'. <br /> g) The primary and secondary commodities will be construction materials. These materials <br /> will be hauled off site for wholesale and retail use. <br /> h) There will be no incidental products mined/extracted by the proposed operation. <br /> i) There is no intention to use explosives on this property. <br /> D-'.I� <br />