Laserfiche WebLink
Name of Addressee <br />Page 2 <br />Date <br />Please verify the quantities of topsoil salvaged, storage location and quantity needed to provide <br />an adequate depth of topsoil to establish a sustainable vegetative cover. <br />3. The text states that “topsoil stockpile F will contain 24,000 CY. It will be spread over the 22 <br />acres of the reclaimed unit train loadout to a depth of approximately 1.2 feet.” The volume of <br />topsoil required to cover 22 acres at a depth of 1.2 feet is 42,592 CY, but only 24,000 CY are in <br />the stockpile. This is a difference of 18,592 CY. Please clarify the area to be topsoiled, the <br />topsoil depth, stockpile volume and any additional topsoil source that may be used. <br /> <br />2.05.4(2)(e) – Revegetation Plan <br /> <br /> No comment. <br /> <br />2.05.6(2) – Fish and Wildlife Plan <br /> <br /> No comment. <br /> <br />4.06 – Topsoil <br /> <br /> No comment. <br /> <br />4.15 – Revegetation <br /> <br /> No comment. <br /> <br />4.18 – Protection of Fish, Wildlife, and Related Environmental Values <br /> <br /> No comment. <br /> <br />