My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-26_REVISION - P2010026 (3)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010026
>
2014-09-26_REVISION - P2010026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:33:05 AM
Creation date
9/29/2014 4:18:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010026
IBM Index Class Name
Revision
Doc Date
9/26/2014
Doc Name
Modification to an existing NOI form 2 MD04
From
Shell Frontier Oil & Gas Inc.
To
DRMS
Type & Sequence
MD4
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shell Frontier Oil & Gas Inc. <br />FINANCIAL WARRANTY CALCULATION FOR AS -BUILT <br />SUBSURFACE RECLAMATION COSTS <br />Site: East RD &D Pilot Project Date: August 21, 2014 <br />Task no.: 10 <br />Lab analytical costs: Analytical suite Cost <br />Suite description <br />BETX <br />BETX $58 <br />Included as part of BTEX analysis <br />Benzene $58 <br />BETX + selected metals, inorganics & semi -VOA's <br />Expanded $430 <br />NA - temperature monitoring transducer only <br />Temperature $0 <br />Assumptions: <br />1 - Natural cooling of the pyrolyzed reservoir is expected to take 2 years after cessation of production. <br />2- Two years of reservoir temperature monitoring necessary during post - production cooling phase. <br />3- Five years of ground water monitoring at pad 138-4 -298. Includes two years of initial monitoring during <br />post - production cooling phase followed by three years of additional monitoring required to demonstrate <br />compliance with ground water quality standards. <br />4- Reservoir voids filled with water - NA - Project terminated prior to leaching and formation of voids. <br />Monitoring costs: <br />Manpower: Operator: $51,200 Per technician per year <br />0.5 1/2 time technician <br />$25,600 Total per year <br />O & M: Pumps & controllers: $35,840 Monitoring well pumps & equipment <br />Electricity (portable generator): $6,226 Power for well pump operation only <br />Waste disposal: $10,240 Waste water from monitoring wells only <br />Reporting: $25,600 <br />$77,906 Total per year <br />Monitoring: YEAR #WELLS PARAMETERS #SAMPLESNR COSTNR <br />Observer wells: 1 6 Temperature 4 $0.00 <br />2 6 Temperature 4 $0.00 <br />Hydrology pad 1384-298: 1 5 Expanded 4 $8,600.00 <br />2 5 Expanded 4 $8,600.00 <br />3 5 BTEX 2 $580.00 <br />4 5 BTEX 2 $580.00 <br />5 5 BTEX 2 $580.00 <br />Reservoir filling costs *: Water truck - 3,500 gal. capacity: <br />Cost of water: na /gal. Total gallons: na Total water cost: na <br />Cost of hauling: na /hour Gallons /load: na Hours /load: na <br />Total hauling time (hours): na Total hauling cost: na <br />Total reservoir filling cost: na <br />* NA - Project activities terminated prior to leaching and formation of voids. <br />Total job cost: YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR r, FILL RESERVOIR <br />$112,106 $112,106 $104,086 $104,086 $104,086 na <br />Total: $536,471 <br />P- 2010 -026 post -mod4 bondcalc 01 b revised Page 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.