Laserfiche WebLink
P- 2010 -026 post -mod4 bondcalc 01 b revised Page 11 of 15 <br />Shell Frontier Oil & Gas Inc. <br />FINANCIAL WARRANTY CALCULATION FOR AS -BUILT <br />SCRAPER WORK <br />Site <br />East RD &D Pilot Project <br />Date August 21, 2014 <br />Task no. 7 <br />Task <br />Replace stockpiled soil material over disturbed areas (site + access road + pond) <br />Equipment <br />Base model: <br />Cat 623G <br />Type: <br />Single engine elevating <br />State: Colorado <br />County: Rio Blanco <br />Labor zone: 1 <br />Hourly cost <br />Ownership: $79.50 <br />Horsepower: 365 <br />Operating: <br />$125.44 <br />Utilization: 100% $125.44 <br />Max. cap. (cy): 23.00 <br />Operator: $33.77 <br />Weight (UST): 41.35 <br />Total: $238.71 <br />Volume <br />23,022 CCY <br />Swell: <br />1.119 Final: <br />25,762.71 LCY <br />Material description: Earth - Loam <br />Derivation: Assume 12 <br />inch replacement depth over disturbed areas (15.36 ac. less <br />TS piles @ 1.09 acres <br />= 14.27 net acres). <br />Production <br />Hauling capacity: <br />Rated payload: <br />55,200 LBS <br />Material weight: <br />2,100 LBS /LCY <br />Material description: <br />Payload capacity: <br />26.29 LCY <br />Earth - Loam <br />Struck volume: <br />18.00 LCY <br />Heaped volume: <br />23.00 LCY <br />Average volume: <br />20.50 LCY <br />Adjusted capacity: <br />20.50 LCY <br />Cycle time: <br />HAUL <br />RETURN <br />Distance: <br />700 <br />700 feet <br />Grade resistance: <br />2.00% <br />-2.00% Road condition description for rolling resistance: <br />Rolling resistance: <br />8.00% <br />8.00% Soft, rutted dirt, no maintenance or <br />water, 4" tire penetration <br />Total resistance: <br />10.00% <br />6.000 <br />Max. attainable speed: <br />659 <br />1,982 per Cat Handbook rimpull & retarder curves <br />Weight to power ratio: <br />377.81 <br />226.58 Ibs /hp <br />Acceleration / deceleration factor: <br />0.977 <br />0.680 per Church's Excavation Handbook <br />Load time *: <br />0.90 <br />min. per Cat Handbook <br />Haul time * *: <br />1.09 <br />min. * *includes acceleration / deceleration adjustment <br />Maneuver & spread time *: <br />0.70 <br />min. <br />Return time: ** <br />0.52 <br />min. <br />Total cycle time: <br />3.21 <br />min. no <br />Unadjusted production: <br />383.58 <br />LCY /hr per scraper * ** ** *(per scraper pair <br />on push -pull models) <br />Job condition correction factors: <br />Site altitude: <br />6,615 <br />feet Altitude adjustment *: <br />1.000 <br />Job efficiency: <br />1 daytime shift per day (50 min. hour) <br />0.833 <br />Net correction: <br />0.833 <br />Adjusted production: <br />319.52 <br />LCY /hr per scraper <br />Work team size: <br />2 <br />Scraper(s) NOTE: Min. 2 scrapers required on push -pull <br />models (add increments of 2) <br />Work team production: <br />639.04 <br />LCY /hour <br />Job totals <br />Job time (hours): <br />40.31 <br />Job unit cost ($ /LCY): $0.747 <br />Job cost: $19,247 <br />P- 2010 -026 post -mod4 bondcalc 01 b revised Page 11 of 15 <br />