My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-26_REVISION - P2010026 (3)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010026
>
2014-09-26_REVISION - P2010026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:33:05 AM
Creation date
9/29/2014 4:18:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010026
IBM Index Class Name
Revision
Doc Date
9/26/2014
Doc Name
Modification to an existing NOI form 2 MD04
From
Shell Frontier Oil & Gas Inc.
To
DRMS
Type & Sequence
MD4
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P- 2010 -026 post -mod4 bondcalc 01b revised Page 10 of 15 <br />Shell Frontier Oil & Gas Inc. <br />FINANCIAL WARRANTY CALCULATION FOR AS -BUILT <br />RIPPING WORK - AREA METHOD <br />Site <br />East RD&D Pilot Project <br />Date <br />August 21, 2014 <br />Task no. <br />6 <br />Task <br />Rip all regraded surfaces to a depth of 18 inches prior to soil replacement <br />Equipment <br />Base model: <br />Cat D8T - SU <br />Blade type: <br />Semi - Universal <br />Blade width ft): <br />12.92 <br />Attachment: <br />Multi -shank ripper <br />Type: Adjustable parallelogram <br />State: Colorado <br />County: <br />Rio Blanco <br />Labor zone: <br />1 <br />Hourly cost <br />Ownership: $68.76 <br />Horsepower: <br />310 <br />Operating - dozer: <br />$95.55 Utilization: <br />100% $95.55 <br />Weight- dozer: <br />42.43 <br />Operating - ripper: <br />$6.92 Utilization: <br />100% $6.92 <br />- blade: <br />5.28 <br />Operator: $40.57 <br />- ripper: <br />5.37 <br />Total: $211.79 <br />Total (UST): <br />53.08 <br />Quantities <br />15.36 acres <br />Rip depth: 1.50 <br />feet Final volume: <br />37,171.20 <br />BCY or CCY <br />Derivation: Total disturbed area = 15.36 acres <br />Production <br />Unadjusted production <br />Ripping depth: <br />1.50 feet/pass <br />Ripping width: <br />7.08 feet/pass <br />Ripping length: <br />300.00 feet/pass <br />Machine speed: <br />88.00 feet/min. <br />Maneuver time: <br />0.25 min. /pass <br />Production per acre: <br />0.800 acres /hr <br />Unadjusted production: <br />1,934.91 cu.yds. /hr <br />JOB CONDITION CORRECTION FACTORSt <br />FACTOR <br />Job efficiency: <br />1 daytime shift per day <br />50 min. hour <br />0.833 <br />Site altitude: <br />6,615 feet <br />1.000 <br />per Cat Handbook <br />Net correction: <br />0.833 <br />Adjusted production <br />1,611.78 CY /hour per machine <br />Work team size: <br />3 Machine(s) <br />Work team production: <br />4,835.33 CY /hour <br />2 pass coverage? (enter "yes" or "no "): yes <br />Final work team production: <br />2,417.67 <br />CY /hour <br />Job totals <br />Job time: 15.37 <br />hours <br />Job unit cost: $0.263 <br />per CY <br />Job cost: $9,769 <br />P- 2010 -026 post -mod4 bondcalc 01b revised Page 10 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.