ameo- <br /> road above the ADR haul road turn around area. <br /> A Cat dozer was shaping the slope below ADR haul road stations 55+00 to 65+00. <br /> Excess cut from slope grading activities was transported to Bench F between stations F12+CO to <br /> F15+00, placed as structural fill, and compacted. <br /> A Cat dozer and excavator removed excess material cut upslope from Bench H between stations <br /> H8+00 to H13+00 to the ADR haul route. The material was transported to the Squaw Gulch <br /> buttress fill adjacent to Bench J between stations J10+00 to J15+00 and was placed as structural <br /> fill and compacted. <br /> Subgrade: <br /> Two dozers continued slope grading the subgrade downslope of Bench DID between stations <br /> DD4+00 to DD8+00 in the Phase 1 area while a Cat hammer hoe broke oversized rock in the, <br /> subgrade surface. Portions of the subgrade in this area were compacted with a smooth drum <br /> roller. <br /> The subgrade was certified for SLF placement from 10 feet upslope of Bench B to Bench DID <br /> between approximate stations BO+00 to B8+00. <br /> Soil Liner Fill: <br /> Cat 777 haul trucks transported SLF from the Cameron stockpile to a location below Bench F <br /> between stations FO+00 to F10+00 in the Phase 1 area on approved subgrade where it was <br /> stockpiled for future use. <br /> Soil liner fill (SLF)was transported from the Phase 1 stockpile located below Bench F between <br /> stations FO+00 to F10+00 and was placed along Bench DD from stations DD4+00 to DD10+00. <br /> Low Volume Solution Collection Fill: <br /> The following low volume solution collection fill (LVSCF) areas in the PSSA were placed to <br /> finished grade per project specifications, inspected, and approved for primary geomembrane <br /> placement.- <br /> The ADR haul road (within the PSSA) and on the southern and central PSSA floor acid <br /> slopes. <br /> See the attached LVSCF map for all placement and accepted locations for primary geomembrane <br /> deployment. <br /> SLF Processing: <br /> Cameron Site: No SLF mining or processing occurred at the Cameron Site. However, Ames <br /> continued transporting the Cameron stockpiled SLF to a new stockpile located below Bench i= <br /> between stations FO+00 to F10+00 in the Phase 1 area. The processing equipment remains at <br /> the Cameron site. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: No work was performed during this reporting period. <br /> Tertiary Underdrain: Complete within the PSSA footprint. <br /> 2014 09 13-MLE2 WEEKLY FINAL Page 24 7 <br />