My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-25_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-09-25_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 4:54:04 AM
Creation date
9/26/2014 8:39:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/25/2014
Doc Name
Weekly CQA Report: Week ending 09/13/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame&9 <br /> CRIPPLE CREEK A VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF)& HWY 67 RE-ALIGNMENT MONITORING WEEKLY REPORT <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: September 13, 2014 <br /> Location: Cripple Creek&Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 09.7.2014 through 09.13.2014 <br /> Days S M T W T F I S <br /> D D D D D D D <br /> Work Shifts <br /> N N N N N [_N <br /> D=Day Shift N=Night Shift H=Holli(ay <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 54OF to 71OF Cloud Cover: Partly cloudy to overcast <br /> Lows: 28 <br /> 0F to 46 oF Precipitation: Rain: Sun., Mon., Tue., Wed., Fri. <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF(PSSA, Phase 1,and 2) <br /> Topsoil/Overburden Stripping: None. <br /> Tree Grubbing and Clearing, Chipping: None. <br /> Production Drilling: No production drilling occurred in the VLF. <br /> Production Blasting: Production blasting occurred within the VLF near underground working <br /> LIG#6639. <br /> Structural Fill: <br /> All structural fill material discussed below was placed and compacted per the project technical <br /> specifications unless otherwise stated. An AMEC Quality Assurance(QA) professional monitored <br /> material temperatures placed within fill areas. Average structural fill temperatures were above <br /> 32°F. <br /> Stockpiled cut material was hauled from ADR road station 15+00 to an area upslope of Bench A <br /> station A15+00. The material was placed as structural fill in approximately 3-foot lifts and was <br /> compacted. <br /> Ames cut material from Bench B and placed it as structural fill on the northeast temporary access <br /> 2014 0913-MLE2 WEEKLY FINAL Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.