My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-23_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-09-23_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 4:36:48 AM
Creation date
9/24/2014 7:05:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/23/2014
Doc Name
Weekly CQA Report: Week ending 09/06/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIP ame <br /> PLE CREEK 8 VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF) & HWY 67 RE-ALIGNMENT MONITORING WEEKLY REPORT <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: September 6, 2014 <br /> Location: Cripple Creek&Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 08.31.2014 through 09.06.2014 <br /> Days S M T W T F I S <br /> H D D D D D- <br /> Work Shifts <br /> D=Day Shift N=Night Shift H=Holliday <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 650F to 77°F Cloud Cover: Partly cloudy to overcast <br /> Lows: 420F to 49°F Precipitation: Rain: Friday and Saturday <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> I) Earthworks <br /> A) VLF (PSSA, Phase 1, and 2) <br /> Topsoil/Overburden Stripping: None. <br /> Tree Grubbing and Clearing,Chipping: None. <br /> Production Drilling: Production drilling occurred in the VLF. <br /> Production Blasting: No production blasting occurred within the VLF. <br /> Structural Fill: <br /> All structural fill material discussed below was placed and compacted per the project technical <br /> specifications unless otherwise stated. <br /> A dozer performed cut and slope re-grading below the ADR road near Bench H stations H12+00 <br /> to H14+00. Excess material was loaded by a Cat 345 and hauled to the buttress fill and butt <br /> dumped. No lift placement or compaction occurred. <br /> A Cat dozer was observed performing slope grading below the Phase 2 diversion channel east of <br /> the Phase 2 sedimentation pond. <br /> 2014 09 06-m1c2—cWy final page 1 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.