My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-17_REVISION - M1984008
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984008
>
2014-09-17_REVISION - M1984008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:51 PM
Creation date
9/18/2014 8:43:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984008
IBM Index Class Name
Revision
Doc Date
9/17/2014
Doc Name
TR Submittal- Weed Control Plan
From
Continental Materials Corp.
To
DRMS
Type & Sequence
TR1
Email Name
TAK
TCW
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Following is the schedule for the weed control program. Refer to the attached map for weed locations. <br /> YEAR SPRING(April—May) FALL(late August-September) <br /> 2015 Spray the Russian knapweed north of Spray the Russian knapweed north of <br /> the small pond. Spray the musk the small pond. Spray the musk thistle <br /> thistle near Townsend Dr.and near Townsend Dr.and surrounding <br /> surrounding the small pond. the small pond. <br /> 2016 Spray the Canada thistle east of the Spray the Canada thistle east of the <br /> small pond. Re-spray for knapweed small pond. Removal of the remaining <br /> and musk thistle as necessary. Russian olive/saltcedar near Townsend <br /> Removal of half of Russian Dr. <br /> olive/saltcedar near Townsend Dr. <br /> 2017 Removal of the Russian Removal of the Russian olive/saltcedar <br /> olive/saltcedar surrounding the small immediately east of the small pond. <br /> pond. <br /> 2018 Respray for knapweed and thistles on Respray for knapweed and thistles on <br /> the north and west areas. Removal the north and west areas. Removal of <br /> of the Russian olive/saltcedar east of the Russian olive/saltcedar east of <br /> small pond. small pond. Weed survey and mapping <br /> along Arkansas River. <br /> 2019 Removal of the Russian Removal of the Russian olive/saltcedar <br /> olive/saltcedar surrounding the large east of large pond. <br /> pond. <br /> 2020 Spray and cut weeds identified along Spray and cut weeds identified along <br /> the Arkansas River. the Arkansas River. <br /> This weed control program can be modified to respond to changes in weed growth or to respray with <br /> different herbicides. <br /> The east sides of both ponds contain delineated wetlands,which will staked out when weed control <br /> methods are used nearby. Care will be taken to avoid spraying into the wetlands and to avoid soil filling <br /> or disturbance. <br /> During the program,we will be consulting with the Turkey Creek Conservation District and spraying <br /> contractors to evaluate methods and chemical herbicides for effectiveness. <br /> With all the areas of the site treated,Transit Mix will continue to insure containment and move toward <br /> eradication in the years after 2020. During this time period,we expect that soil from the stockpiles at <br /> the southwest corner of the site will be spread on weed eradicated areas and drilled with grass seed. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.