Laserfiche WebLink
CRIPPLE CREEK &VICTOR GOLD MINING Co. ameo <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF) & HWY 67 RE-ALIGNMENT MONITORING WEEKLY REPORT <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: August 30,2014 <br /> Location: Cripple Creek&Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 08.24.2014 through 08.30.2014 <br /> Days S M T WIT F S <br /> Work Shifts D D <br /> D=Day Shift N=Night Shift W=Weather day <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: _ <br /> Highs: 680F to 740F Cloud Cover: Partly cloudy to overcast <br /> Lows: 420F to 48OF Precipitation: Rain: Mon., Tues.,Wed.,Thurs., <br /> and Fri. <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> I) Earthworks <br /> A) VLF(PSSA, Phase 1 and 2) <br /> Topsoil/Overburden Stripping: None. <br /> Tree Grubbing and Clearing,Chipping: None. <br /> Production Drilling: Production drilling occurred in the VLF. <br /> Production Blasting: Production blasting occurred within the VLF. <br /> Structural Fill: <br /> All structural fill material discussed below was placed and compacted per the project technical <br /> specifications. <br /> An excavator loaded Cat 740 haul trucks with material from above station A22+00 and from <br /> station D11+50. The material was transported to stations F22+00 to F26+00 and was placed as <br /> structural fill. <br /> Two dozers and an excavator performed slope re-contouring and rough grading below the <br /> Midway area, above stations 110+00 to H2+00 and bermed the ADR haul road. <br /> A D8 dozer placed cut to fill near station F20+00. <br /> 20140830.ml.2 weekly final Page 1 of 8 <br />