My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-09-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:38 PM
Creation date
9/12/2014 9:16:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/11/2014
Doc Name
Weekly construction quality assurance report week ending 8/23/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w I.: <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) & HWY 67 RE- ALIGNMENT MONITORING WEEKLY REPORT <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: August 23, 2014 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 08.17.2014 through 08.23.2014 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />D <br />D =Day Shift N =Night Shift W= Weather day <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 63 °F to 73 °F Cloud Cover: Partly cloudy to Overcast <br />Lows: 42 °F t0 43 °F Precipitation: Rain: Tues, Wed, Fri, <br />Wind: Variable <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1 and 2) <br />Topsoil /Overburden Stripping: None. <br />Tree Grubbing and Clearing, Chipping: None <br />Production Drilling: Production drilling occurred along the perimeter road near stations P4 +00 <br />to P10 +00 to facilitate trenching for a HDPE waterline. <br />Production Blasting: Production blasting took place within the VLF along the perimeter road <br />near stations P6 +00 to P10 +00. <br />Structural Fill: <br />All structural fill material discussed below was placed and compacted per the technical <br />specifications. <br />A Cat and excavator loader placed material cut from above ADR haul road station 15 +00 into Cat <br />777 and 740 haul trucks. The material was transported to and placed as structural fill at ADR <br />road Stations 20 +00 to 25 +00 and upslope of stations J12 +00 to J14 +00. <br />2074.08.23 -mle2 mekly final Page 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.