Laserfiche WebLink
Mr. Frisch <br />Page 2 <br />September 11, 2014 <br />Please provide a discussion of how the stormwater will be routed from the overflow channel <br />to the natural drainage on the east side of the site. Upon reviewing the final grading plan <br />(sheet C -102) it appears that stormwater may be captured in a small depression to the east of <br />the groundwater pond. <br />6. The drawing on Figure 2 depicts a berm on the north and east sides of the groundwater pond. <br />Please provide a brief explanation for constructing the berm in the proposed location. <br />This concludes the Division's preliminary adequacy review of this Technical Revision. Please <br />remember that the decision date for this Technical Revision is September 12, 2014. As <br />previously mentioned, if you are unable to provide satisfactory responses to any inadequacies <br />prior to this date, it will be your responsibility to request an extension of time to allow for <br />continued review of this Technical Revision. If there are still unresolved issues when the <br />decision date arrives and no extension has been requested, the Technical Revision will be denied. <br />If you have any questions, please contact me at (303)866 -3567 x8116. <br />Sincerely, <br />Michael A. Cu ngham <br />Environmental Protection Specialist <br />