Laserfiche WebLink
Susan Burgmaier -6- September 2, 2014 <br />Rule 2.05.6(6) Subsidence Survey, Subsidence Monitoring, and Subsidence Control Plan <br />33. Issue resolved; BRL directed the Division to the description of the structure, and <br />updated Map 27 for clarity. <br />34. Issue resolved; BRL revised pages 2.05 -171 and 2.05 -178 as requested. <br />35.a. Issue resolved; BRL included the requested discussion. <br />b. i. This issue will be resolved with the resolution of Item 28. <br />ii. Issue resolved; the Lidar surveys proposed by BRL will suffice. <br />36. Issue resolved; BRL revised page 2.05 -171 as requested. <br />37. Issue resolved; BRL indicated that the panel mining direction could not be changed. <br />Though mining in an upstream direction would be ideal, the increased frequency of flow <br />monitoring will allow BRL and the Division to quickly identify any interruptions to flow in the <br />West Fork of Terror Creek, so any interruptions resulting from mining operations would be <br />immediately resolved. <br />38. Issue resolved; BRL revised pages 27 and 29 of Exhibit 15 as requested. <br />39. Issue resolved; BRL revised page 29 of Exhibit 15 as requested. <br />40. Issue resolved; BRL revised page 30 of Exhibit 15 as requested. <br />41. Issue resolved; BRL revised page 33 of Exhibit 15 as requested. <br />42. a. Page 45 of Exhibit 15 was revised as requested to include a plan for subsidence <br />monitoring and repair on Stevens Gulch Road. The plan should also include subsidence <br />monitoring stations on the upper stretch of Stevens Gulch Road, over Panels 24, 26, and 28. <br />Please revise Map 278 to include subsidence monitoring stations on Stevens Gulch Road, over <br />Panels 24, 26, and 28, to verify BRL's subsidence prediction for the road; and include those <br />monitoring stations in the list of monitoring stations presented on pages 2.05 -177 and -178 of <br />the permit application package (Rule 2.05.6(6)(c)). <br />BRL - Subsidence monitoring stations for Stevens Gulch Road were added to Map 27B and page <br />2.05 -178. <br />b. Issue resolved; BRL revised the monitoring plan as requested. <br />C. Issue resolved; BRL included provisions for appropriate signage on Stevens Gulch Road. <br />43. Issue resolved; BRL revised Figure 15 -3 as requested. <br />Rule 2.10 — Maps and Plans <br />44. Issue resolved; BRL revised Maps 10A and 10B as requested. <br />45. Issue resolved; BRL revised Map 27 as requested. <br />46. Issue resolved; BRL revised Map 27B as requested. With resolution of Item 42.a., above, <br />please revise the map to include proposed subsidence monitoring stations on Stevens Gulch <br />Road. <br />Rule 2.04.7 — HydrologV Description <br />Rule 2.04.7(1) — Ground Water Information <br />47. The Division requested that, to ensure compliance with the currently approved PAP, the <br />two up- gradient groundwater monitoring points should be made fit - for - purpose or replaced, so <br />