My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-08_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2014-09-08_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:31 PM
Creation date
9/9/2014 10:24:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
9/8/2014
Doc Name
August VWP Monitoring Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! � E�h <br />4 <br />Huddleston -Berry <br />y /JCx Fngincering & Tcsfing, LLC <br />Bowie Resources, LLC <br />43659 Bowie Road <br />Paonia, Colorado 81428 <br />Attention: Mr. Bill Bear <br />Subject: August 2014 Vibrating Wire Piezometer Monitoring <br />Bowie Coal Waste Disposal Area No. 2 <br />Paonia, Colorado <br />640 White Avenue <br />Grand Junction, CO 81501 <br />Phone: 970 - 255 -8005 <br />Fax: 970 -255 -6818 <br />HuddlestoiiBefTy C� bresnan. net <br />www.HBFT GJ.com <br />September 2, 2014 <br />Project #01349 -0001 <br />Reference: Stability Ewilualion, Technicril Revision #RS, Gob Pile 42 Dij,h7g Area, Boit,ie <br />No. 2 Ifine by Huddle ston -Berry Engineering & Testing, LLC for Bowie <br />Resources, LLC, June 3, 2014. <br />Dear Mr. Bear, <br />At the request of the Colorado Division of Reclamation, Mining and Safety (DBMS), <br />Huddleston -Berry Engineering & Testing, LLC (I-IBET) prepared this letter regarding monthly <br />monitoring of vibrating wire piezometers at Coal Waste Disposal Area No. 2 (CWDA No. 2) at <br />the Bowie mine near Paonia, Colorado. The intent of the monitoring; was to detect significant <br />changes in the pore water pressures within the coal waste which may impact the stability of the <br />waste pile. <br />Monitoring <br />Between 2005 and 2012, a total of ten vibrating wire piezometers were installed in CWDA No. <br />2. However, several of the piezometers have been damaged or have otherwise ceased to <br />function. Currently, five of the piezometers are functional. However, only VWP -06 and VWP - <br />08 are required to be monitored on a monthly basis. <br />Monitoring of VWP -06 and VWP -08 was completed by Buckhorn Geotcch, Inc. (BGI) on <br />August 22" d, 2014. The monitoring report prepared by BGI is attached and the data is <br />summarized in the following table. <br />VWP ID <br />Initial Pore <br />7/25/14 Pore <br />8/22/14 Pore <br />Difference Since <br />Difference Since <br />Pressure <br />Pressure <br />Pressure <br />Installation <br />Last Reading <br />(psi) <br />(psi) <br />(psi) <br />(psi) <br />(psi) <br />VWP -06 <br />11.3 <br />16.8 <br />17.4 <br />+6.1 <br />+0.6 <br />VWP -08 <br />8.2 <br />9.4 <br />9.6 <br />+1.4 <br />+0.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.