My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-28_GENERAL DOCUMENTS - C2010088
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010088
>
2014-08-28_GENERAL DOCUMENTS - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:08 PM
Creation date
9/3/2014 8:14:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
General Documents
Doc Date
8/28/2014
Doc Name
Midterm (MT1)
From
DRMS
To
Jim Stover
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade Light -Use Road #2 <br />Site: Fruita Loadout Permit Action: MT1 Pennit/Job #: C2010088 <br />PROJECT IDENTIFICATION <br />Task #: 033 <br />Date: 8/26/2014 <br />User: ZTT <br />State: Colorado <br />County: Mesa <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi- Universal <br />Attachment: <br />t -shank ripper <br />Shift Basis: <br />l per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: 0088 -033 <br />Total unit Cost/Hour: $267.73 <br />Total Fleet Cost/Hour: $267.73 <br />MATERIAL QUANTITIES <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$81.29 <br />NA <br />Operating Cost/Hour: <br />$142.41 <br />100 <br />Ripper op. Cost/Hour: <br />$5.18 <br />50 <br />Operator Cost/Hour: <br />$38.85 <br />NA <br />Total unit Cost/Hour: $267.73 <br />Total Fleet Cost/Hour: $267.73 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />1,100 <br />Swell factor: <br />1.165 <br />Loose volume: <br />1.282 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 15 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly production: 910.5 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />0% <br />4,500 feet <br />,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock,_ 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />AVG.) <br />Material consistency: 0.900 <br />CAT HB ) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.