My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-28_GENERAL DOCUMENTS - C2010088
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010088
>
2014-08-28_GENERAL DOCUMENTS - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:08 PM
Creation date
9/3/2014 8:14:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
General Documents
Doc Date
8/28/2014
Doc Name
Midterm (MT1)
From
DRMS
To
Jim Stover
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: Regrade Access Road <br />Site: Fruits Loadout Permit Action: MT1 <br />PROJECT IDENTIFICATION <br />Permit /Job#: C2010088 <br />Task #: 032 State: Colorado Abbreviation: None. <br />Date: 8/26/2014 County: Mesa Filename: 0088 -032 <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 12M <br />Ripper Attachment: <br />Cost Breakdown: <br />Horsepower: 158 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $109.93 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODIJCTION <br />0.4+0 <br />15 <br />acres <br />Average Grader Speed: <br />1.50 <br />Utilization % <br />Ownership Cost/Hour: <br />$24.98 <br />NA <br />Operating CostlHour: <br />$46.35 <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />feet <br />Operator Cost/Hour: <br />$38.60 <br />NA <br />Total Unit Cost/Hour. <br />$109.93 <br />feet <br />Total Fleet Cost/Hour: $109.93 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODIJCTION <br />0.4+0 <br />15 <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish <br />grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />10.40 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />8.40 <br />feet <br />Unadjusted Hourly Unit Production: <br />L5273 <br />acres /hour <br />Job Condition Correction Factors <br />Site Altitude: 4500 feet <br />Source <br />Altitude Adj-. 1.00 <br />(CAT HB) <br />Job Efficiency: 0.85 <br />(1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: 1.2982 <br />Adjusted Hourly Fleet Production: 1.2482 <br />JOB TIME AND COST <br />Fleet size: I Grader(s) Total job time: <br />Unit cost: $84.68 per acre Total job cost <br />acres /Hour <br />acres /Hour <br />0.31 Hours <br />$34 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.