Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 076 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob /Demob Cost * <br />`* two round trips with haul rig:. <br />Total Roadable Mob /Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />2.92 <br />2.92 <br />2.92 <br />2.92 <br />1.50 <br />NA <br />1.50 <br />NA <br />8.83 <br />5.83 <br />Page 2 of 2 <br />GRAND JUNCTION <br />175.00 miles <br />60.00 mph <br />$24.304.70 <br />$4,662.76 <br />Total job time: 17.67 Hours <br />Total job cost: $28,967 <br />CIRCES Cost Estimating Software <br />