Laserfiche WebLink
Mobilization Worksheet Cont °d Task # 075 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area rcgion: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob /Demob Cost * <br />' * two round trips with haul rig: <br />Total Roadable Mob /Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />OS0 <br />NA <br />0.50 <br />NA <br />2.00 <br />1.00 <br />Total job time: <br />Page 2 of 2 <br />GRAND JUNCTION <br />25.00 miles <br />50.00 mph <br />54,564.61 <br />5466.70 <br />4.00 Hours <br />Total job cost: $5,031 <br />CIRCES Cost Estimating Software <br />