Laserfiche WebLink
SL -2 Exclusion Areas <br />Description <br />Acreage <br />South Extension Area <br />399.50 <br />A Pit Highwall Slump <br />9.42 <br />Channel 006 -NE2 <br />0.23 <br />Channel 006 -E1 (006 Gulch) <br />0.36 <br />Light Use Road LU -lA <br />0.20 <br />Light Use Road LU -1 <br />0.83 <br />Light Use Road LU -3 and 4 <br />2.35 <br />Oil Well Road <br />0.95 <br />Road "J" <br />0.69 <br />Culvert I -1 Area <br />0.03 <br />Scraper Road Exclusion <br />12.10 <br />Total <br />426.66 <br />SL -3 Phase I Bond Release Application <br />The SL -3 release request applied to the 414 acres primarily in the South Extension Area. The <br />Division approved 412.35 acres for Phase I bond release. Specifically excluded were: <br />SL -3 Exclusion Areas <br />Description <br />Acreage <br />Postmining Channel PM -2D <br />.85 acres <br />Postmining Channel PM -4D <br />.80 acres <br />Total <br />1.65 <br />R -2 Exclusion Areas <br />Areas excluded from the SL -2 application that were not requested in the SL -3 application include <br />the "A" Pit Highwall Slump (AKA Pit Ramp Slide Area) and the Oil Well Road (10.37 acres). <br />Areas not requested for Phase I bond release in either the SL -2 or SL -3 applications, and therefore <br />not released at that time, included the Tie - Across Haul Road (removed from the permit are during <br />PR6), the Mine Entrance Haul Road, the running surface of Road "J" in the South Extension Area, <br />culverts associated with the unreleased haul roads, the powerline light use road (LU -1B), sediment <br />ponds, and the stock ponds. SL -3 was approved March 21, 2011. <br />PR -6: Transfer of Tie - Across Haul Road to Hayden Gulch Load out Permit <br />The PR -6 application approved transfer of the Tie - Across Haul Road from the Seneca II -W permit <br />to the Hayden Gulch Loadout Permit (C1992 -081). PR -6 approved removal of 214.9 acres from the <br />Page 8 of 18 <br />