My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 31 23 20 <br />TEST PITS <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1. Excavation of test pits in compacted earthfill during the progress of the Work. <br />Location and times of excavating test pits shall be as necessary to examine or <br />obtain samples of specific portions of the work in accordance with the applicable <br />provisions of Section 01 40 00, and as determined by the Engineer. <br />B. Related Sections: <br />1. Section 3105 13 - Soils for Earthwork. <br />2. Section 3123 16 - Excavation. <br />3. Section 31 23 23 - Fill <br />PART 2 PRODUCTS <br />2.1 BACKFILLING TEST PITS <br />After examination of test pits and collection of embankment samples, the test pits shall be <br />backfilled with earthfill conforming to the adjacent embankment materials, which shall be <br />placed in layers, moistened, and compacted in accordance with the applicable provisions of <br />Section 31 23 23, as applicable. <br />PART 3 EXECUTION <br />3.1 EXCAVATION OF TEST PITS <br />A. The surface dimensions and depth of each test pit will be determined by the Engineer, <br />but in general, no test pit will involve the excavation and backfill of more than 10 <br />cubic yards of earthfill. <br />B. The sides of the test pits shall be excavated to as near vertical as practicable but in <br />accordance with applicable safety requirements to allow inspection of the compacted <br />earthfill by the Engineer. <br />C. The Contractor shall adjust its operations so that test pits will remain open for a <br />maximum of 4 hours to facilitate inspection and collection of embankment samples. <br />D. Prior to backfilling the test pit wall shall be sloped to 1 vertical to 1 horizontal or <br />flatter. <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Test Pits <br />312320 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.