My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 PRODUCTS - Not Used. <br />PART 3 EXECUTION <br />3.1 PREPARATION <br />A. Call Local Utility Line Information service not less than three working days before <br />performing Work. <br />1. Request underground utilities to be located and marked within and surrounding <br />construction areas. <br />B. Identify required lines, levels, contours, and datum. <br />C. Protect utilities indicated to remain from damage. <br />D. Protect bench marks, survey control points, existing structures, fences, paving, from <br />excavating equipment and vehicular traffic. Immediately replace any monuments <br />damaged or removed by construction activities. <br />3.2 FIELD QUALITY CONTROL <br />A. Section 01 40 00 - Quality Requirements: Field inspecting, testing. <br />B. Request visual inspection of bearing surfaces by Engineer and inspection agency before <br />installing subsequent work. Contact Engineer 48 hours before exposing the foundation <br />and coordinate activities so the area can be observed, mapped and covered within the <br />time limitations presented in this section. <br />3.3 EXCAVATION FROM BORROW <br />A. The working limits for borrow area operation shall be determined by the Contractor and <br />will be subject to review by the Engineer. The Contractor shall be responsible for <br />developing the borrow areas in a manner so as not to adversely impact his site /work area <br />dewatering or site runoff /diversion controls. <br />B. Borrow area operations shall be within the pit boundaries, including equipment routing <br />within the active areas. <br />C. No borrowing of bedrock for the clay core materials shall be allowed within 200 feet of <br />the proposed toe of the embankment except for foundation excavation material. Material <br />removed for foundation excavation, if acceptable, can be used as fill. Any excavation of <br />bedrock shall be at slopes of 6:1 (horizontal to vertical) or flatter. <br />D. Perform borrow area operations in accordance with all applicable Federal, State, and <br />local regulations. <br />E. The Contractor will not be required to excavate surfaces of borrow pits to any specified <br />lines and grades. Surfaces shall be left in a reasonably smooth and even condition. <br />Borrow pits shall be operated and left in a condition so as not to impair the usefulness <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Excavation <br />312316 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.