My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Water: <br />Potable; containing no impurities, suspended particles, algae or dissolved natural <br />salts in quantities capable of causing: <br />a. Corrosion of steel. <br />b. Volume change increasing shrinkage cracking. <br />C. Efflorescence. <br />d. Excess air entraining. <br />C. Fine Aggregate: <br />1. Washed natural sand. <br />2. Gradation in accordance with ASTM C33 and represented by smooth <br />granulometric curve within required limits. <br />3. Free from injurious amounts of organic impurities as determined by ASTM C40. <br />D. Mix: <br />1. Portland cement, sand and water. Do not use ferrous aggregate or staining <br />ingredients in grout mixes. <br />PART 3 EXECUTION <br />3.1 PLACING GROUT <br />A. Place grout material by pumping quickly and continuously to ensure abandoned <br />dewatering pipe fills to refusal. <br />B. Place vent pipes in dewatering pipes as necessary to assist in filling pipe with grout. <br />C. No grout shall be placed adjacent to any fill section of the embankment prior to the <br />section being constructed to its full height. <br />D. No grout shall be placed prior to Engineer's approval of the embankment construction for <br />the embankment adjacent to the dewatering pipe to be grouted. <br />3.2 FIELD QUALITY CONTROL <br />A. Submit proposed mix design and grouting method to Engineer for review prior to <br />commencement of Work. <br />B. Visually inspect grout as it is delivered to site to determine if adequate slump is <br />maintained to allow for grout to be pumped into abandoned dewatering pipe. <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Grouting <br />036000 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.