My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION O1 50 00 <br />TEMPORARY FACILITIES AND CONTROLS <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A. Temporary Utilities: <br />1. <br />Temporary electricity. <br />2. <br />Telephone service. <br />3. <br />Facsimile service. <br />4. <br />Temporary water service. <br />5. <br />Temporary sanitary facilities. <br />B. Construction Facilities: <br />1. <br />Field offices and sheds. <br />2. <br />Vehicular access. <br />3. <br />Parking. <br />4. <br />Progress cleaning and waste removal. <br />5. <br />Traffic regulation. <br />C. Temporary Controls: <br />1. <br />Barriers. <br />2. <br />Enclosures and fencing. <br />3. <br />Security. <br />4. <br />Water control. <br />5. <br />Dust control. <br />6. <br />Erosion and sediment control. <br />7. <br />Noise control. <br />8. <br />Pollution control. <br />D. Removal of utilities, facilities, and controls. <br />1.2 TEMPORARY ELECTRICITY <br />A. Complement existing power service capacity and characteristics as required for <br />construction operations. <br />1.3 TELEPHONE SERVICE <br />A. Provide, and maintain telephone service to field office at time of project mobilization and <br />throughout the project. <br />1.4 FACSIMILE SERVICE <br />A. Provide and maintain to field office at time of project mobilization. <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Temporary Facilities And Controls <br />01 5000-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.