My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Adjust products to appropriate dimensions; position before securing products in place. <br />1.4 REFERENCES <br />A. For products or workmanship specified by association, trade, or other consensus <br />standards, comply with requirements of standard, except when more rigid requirements <br />are specified or are required by applicable codes or these Specifications. <br />B. Conform to reference standard by date of issue current on Design Documents, except <br />where specific date is established by code. <br />C. When specified reference standards conflict with Contract Documents, request <br />clarification from Engineer before proceeding. <br />1.5 TESTING AND INSPECTION SERVICES <br />A. Employ and pay for services of a testing agency or laboratory acceptable to Owner to <br />perform specified testing. <br />1. Prior to start of Work, submit testing laboratory name, address, and telephone <br />number, and names of proposed personnel to be used and the responsible <br />engineer and principal in charge of the project. <br />B. The testing firm will perform tests, inspections and other services specified in individual <br />specification sections and as required by Engineer. <br />1. Laboratory: Authorized to operate in State of Colorado. <br />2. Laboratory Staff. Maintain full time registered Engineer on staff to review <br />services. <br />3. Testing Equipment: Calibrated at reasonable intervals with devices of an <br />acceptable accuracy. <br />C. Testing, inspections and source quality control may occur on or off project site. Perform <br />off -site testing as required by Engineer or Owner. <br />D. Reports will be submitted by testing firm to Engineer, Contractor, and Owner, indicating <br />observations and results of tests and indicating compliance or non - compliance with <br />Design Documents. <br />1. Submit final report indicating status of Work previously reported as non- <br />compliant. <br />E. Cooperate with testing firm; furnish samples of materials, design mix, equipment, tools, <br />storage, safe access, and assistance by incidental labor as requested. <br />1. Notify Engineer and testing firm 48 hours prior to expected time for operations <br />requiring services. <br />F. Testing and employment of testing agency laboratory or any other form of quality control <br />or quality assurance shall not relieve Contractor of obligation to perform Work in <br />accordance with requirements of Design Documents. <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Quality Requirements <br />014000 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.