Laserfiche WebLink
SECTION 0140 00 <br />QUALITY REQUIREMENTS <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A. Quality control and control of installation. <br />B. Tolerances. <br />C. References. <br />D. Testing and inspection services. <br />E. Testing Standards. <br />F. Quality Control Testing. <br />1.2 QUALITY CONTROL AND CONTROL OF INSTALLATION <br />A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, <br />and workmanship, to produce Work of specified quality. <br />B. Comply with manufacturers' instructions, including each step in sequence. <br />C. When manufacturers' instructions conflict with Design Documents, request clarification <br />from Engineer before proceeding. <br />D. Comply with specified standards as minimum quality for the Work except where more <br />stringent tolerances, codes, or specified requirements indicate higher standards or more <br />precise workmanship. <br />E. Perform Work by persons qualified to produce required and specified quality. <br />F. Verify field measurements are as indicated on Shop Drawings or as instructed by <br />manufacturer. <br />G. Secure products in place with positive anchorage devices designed and sized to withstand <br />stresses, vibration, physical distortion, or disfigurement. <br />1.3 TOLERANCES <br />A. Monitor fabrication and installation tolerance control of products to produce acceptable <br />Work. Do not permit tolerances to accumulate. <br />B. Comply with manufacturers' tolerances. When manufacturers' tolerances conflict with <br />Contract Documents, request clarification from Engineer before proceeding. <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Quality Requirements <br />014000-1 <br />