My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Northern Colorado Constructors, Inc. <br />J &T Consulting, Inc. 1 NCCI Pit #1 <br />8/21/2014 <br />Reclamation Bond Quantities and Costs <br />Phase 13 (9.03 acres) <br />Reclamation Operation <br />Quantity <br />Unit <br />Unit Cost <br />Cost <br />Active Mining Area <br />20% Cost Liner Required to Close Phases 2,4,11 (Credit) <br />1,205 <br />If <br />$11.87 <br />($14,303) <br />20% Cost Permanent liner <br />1,265 <br />If <br />$11.87 <br />$15,016 <br />20% Cost Topsoil Area Above Water <br />0.6 <br />ac <br />$2,178 <br />$1,307 <br />Revegetate Area Above Water <br />0.6 <br />ac <br />$820 <br />$492 <br />Dewatering of Full Pit <br />64.7 <br />Mil. Gal. <br />$201.50 <br />$13,037 <br />Plant Site/Temporary Topsoil Stockpile Areas in Phases 5 <br />Scarifying Ground in Plant Site Area (credit) <br />4.6 <br />ac <br />$200 <br />($920) <br />Topsoil Placement in Plant Site Area (credit) <br />4.6 <br />ac <br />$2,178 <br />($10,019) <br />Revegetate Plant Site Area (credit) <br />4.6 <br />ac <br />$820 <br />($3,772) <br />Scarifying Ground in Topsoil Stockpile Areas (credit) <br />3.0 <br />ac <br />$200 <br />($600) <br />Revegetate Topsoil Stockpile Areas (credit) <br />3.0 <br />ac <br />$820 <br />($2,460) <br />Batch Plant Area <br />Scarifying Ground in Batch Plant Area (credit) <br />10.0 <br />ac <br />$200 <br />($2,000) <br />Topsoil Placement in Batch Plant Area (credit) <br />10.0 <br />ac <br />$2,178 <br />($21,780) <br />Revegetate Batch Plant Area (credit) <br />10.0 <br />ac <br />$820 <br />($8,200) <br />Mobilization <br />1.00 <br />Is <br />$2,500 <br />($2,500) <br />Total Direct Cost <br />($36,703) <br />Overhead and Profit Cost (12.60 %) ($4,625) <br />Contract Cost ($41,327) <br />Project Management (9.25 %) ($3,823) <br />Additional Financial Warranty Required For Phase 13 $457150 <br />Total Financial Warranty Required For All Phases $486, 745 <br />8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.