My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-28_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2014-08-28_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:10 PM
Creation date
8/29/2014 12:07:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/28/2014
Doc Name
Premlinary Adequacy Review Letter
From
DRMS
To
Twentymile Coal Company
Type & Sequence
MR280
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary of MR280 Tasks <br />Site: Foidel Creek Mine Permit Action: MR280 Permit/JoW C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: <br />Date: 8/28/2014 County: <br />User: JDM <br />Colorado <br />Routt <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C056 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Plug and Seal 20 Development Coreholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />288.00 <br />$224,939.55 <br />$34,079.00 <br />$4,903.00 <br />$18,775.00 <br />$23,575.00 <br />Re grade Drill Pads and Mud Pits <br />DOZER <br />158.30 <br />Re ade Access Roads <br />DOZER <br />22.77 <br />Replace Topsoil on Drill Pads and Access Road �REVEGE <br />DOZER <br />87.21 <br />Reseed 32.6 acres of Corehole disturbance <br />32.00 <br />SUBTOTALS: <br />588.28 <br />$306,272 <br />INDIRECT COSTS <br />611?ja9:1W411OXLI0112 <br />Liability insurance: 2.02% <br />Total = <br />$6,186.69 <br />Performance bond: 1.05% <br />Total = <br />$3,215.86 <br />Job superintendent: 100.00 hrs <br />Total = <br />$7,516.00 <br />Profit: 10.00% <br />Total = <br />$30,627.20 <br />TOTAL O & P = <br />$47,545.75 <br />CONTRACT AMOUNT (direct + O & P) = <br />$353,817.75 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />0.00 Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />4.25% Total = <br />$15,037.25 <br />Reclamation management and /or administration: <br />5.00% <br />$17,690.89 <br />CONTINGENCY: <br />0.00 Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$80,273.89 <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />$386,545.89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.