My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-08-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:09 PM
Creation date
8/28/2014 3:46:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/28/2014
Doc Name
Weekly construction quality assurance report week ending 8/16/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec`a <br />A Cat excavator trenched the Phase 2 diversion ditch near station 16 +00. The material was <br />loaded into Cat 740 haul trucks and transported east of the Phase 2 where it was stockpiled for <br />later use as structural fill. <br />Cat dozers were finish grading and a Cat smooth drum roller compacted subgrade on the ADR <br />haul road within PSSA and various surrounding Phase 1 slopes. <br />Soil liner fill was scarified and reconditioned on the PSSA floor and the northeastern PSSA slopes <br />SLF was transported from the Squaw Gulch SLF stockpile to the stockpile area above station <br />DD5 +00 in Phase 1 Area 1. SLF was also hauled and placed in the PSSA below ADR haul road <br />stations 5 +00 to 10 +00. <br />A Cat smooth drum roller compacted the SLF surface from Bench A to the PSSA floor between <br />stations A18 +00 to A20 +00. <br />Subgrade: <br />The following subgrade areas in the PSSA were compacted per project technical specifications to <br />finished grade, inspected, and certified for SLF placement: <br />The subgrade was approved over the ADR haul road from the 9,450 elevation bench to <br />approximately station 7 +00 completing the subgrade acceptance within the PSSA footprint. <br />See the attached subgrade acceptance map for all accepted subgrade locations. <br />Soil Liner Fill: <br />The following SLF areas in the PSSA were compacted per project specifications to finished <br />grade, inspected, and certified for geomembrane placement: <br />r From the intersection of the ADR haul road with Bench B to ADR haul road station 7 +00 <br />including the haul road and the slope above the road to Bench B. <br />Between approximate ADR haul road stations 3 +00 to 7 +00 and the central portion of the <br />PSSA floor adjoining previously approved SLF. <br />See the attached SLF acceptance map for all accepted locations. <br />Low Volume Solution Collection Fill: <br />The following Low Volume Solution Collection Fill (LVSCF) areas in the PSSA were placed to <br />finished grade per project specifications, inspected, and certified for primary geomembrane <br />placement: <br />r The ADR pad <br />From Bench A to the PSSA floor between stations A0 +00 to A4 +00. <br />See the attached LVSCF map for all placement and accepted locations for primary geomembrane <br />deployment. <br />SLF Processincr <br />Cameron Site: No SLF mining or processing occurred at the Cameron Site. Approximately <br />244,860 tons of SLF material has been produced to date and remains stockpiled at the Cameron <br />Site for future use. The processing equipment remains at the Cameron site. No new processing <br />was performed during this reporting period. <br />2014.08.16 -MLE2 WEEKLY FINAL Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.