My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-25_HYDROLOGY - M2003016
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2003016
>
2014-08-25_HYDROLOGY - M2003016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:00 PM
Creation date
8/27/2014 9:46:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003016
IBM Index Class Name
HYDROLOGY
Doc Date
8/25/2014
Doc Name
Substitute water supply plan
From
Division of Water Resources
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Joe Kraig <br />Heit SWSP <br />August 21, 2014 <br />Page 4 of 4 <br />13. Replacement of lagged depletions shall continue until there is no longer an effect on stream <br />flow. <br />14. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other vested water rights has or will occur as a result of this plan. <br />Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all excavation of product from below the <br />water table, and all other use of water at the pit, must cease immediately. <br />15. In accordance with amendments to Section §25 -8- 202 -(7), C.R.S. and Senate Bill 89 -181 <br />Rules and Regulations adopted on February 4, 1992, the State Engineer shall determine if <br />this substitute water supply plan is of a quality to meet requirements of use to which the <br />senior appropriation receiving the substitute supply has normally been put. As such, water <br />quality data or analyses may be requested at any time to determine if the requirement of use <br />of the senior appropriator is met. <br />16. The decision of the state engineer shall have no precedential or evidentiary force, shall not <br />create any presumptions, shift the burden of proof, or serve as a defense in any pending <br />water court case or any other legal action that may be initiated concerning this plan. This <br />decision shall not bind the state engineer to act in a similar manner in any other applications <br />involving other plans, or in any proposed renewal of this plan, and shall not imply <br />concurrence with any findings of fact or conclusions of law contained herein, or with the <br />engineering methodologies used by the Applicant. <br />If you have any questions concerning this approval, please contact loana Comaniciu in <br />Denver at (303) 866 -3581 or Dean Santistevan in Greeley at (970) 352 -8712. <br />Sincerely, <br />Jeff Yeatherage, P.E. <br />�Sla+e�of Water Supply <br />Attachments: Tables 1 -3 <br />City and County of Broomfield Lease (3rd Extension) <br />Administration Protocol `Augmentation Plan Accounting, Division One — South Platte River" <br />Cc: Bill Schneider, Water Commissioner District 2, William.Schneider(c)-state.co.us <br />Brent Schantz, South Platte River Operations Coordinator, Brent. Schantz(aD_state.co.us <br />Division of Reclamation, Mining and Safety <br />J D/J MW /idc <br />
The URL can be used to link to this page
Your browser does not support the video tag.