My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-22_INSPECTION - C1981010
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981010
>
2014-08-22_INSPECTION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:58 PM
Creation date
8/26/2014 8:11:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Inspection
Doc Date
8/22/2014
Doc Name
Inspection Report
From
DRMS
To
Trapper Mining, Inc
Inspection Date
8/18/2014
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 18, 2014 C- 1981 - 010 /Trapper Mine JLE <br />The blast warning sign located in Castor Gulch was missing at the time of the inspection. Mr. Roberts indicated <br />he had an extra sign that he would post at this location. <br />Permit boundary markers were observed throughout the site at various locations. No problems were observed. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2, Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />The following topsoil stockpiles within the active mining /reclamation area were observed: <br />Stockpiles E79 -6, A93 -1, A94 -2, SP5 -94, SP6 -94, EF1, A98 -3, Al -08 and G1 -03 were marked with topsoil <br />markers, appeared stable and vegetated. <br />A patch of musk thistle was observed on topsoil stockpile G4 -02 and will need to be monitored and treated if <br />necessary. <br />A small patch of yellow toadflax was observed on the north side of the G1 -02 topsoil stockpile. Otherwise, the <br />pile was marked and well vegetated. <br />It appears a scraper has removed topsoil from pile Al -09. According to Graham Roberts, this material was used <br />for the reclamation of a rill. Otherwise, the pile was marked and well vegetated. <br />Topsoil stockpile G2 -06 had had some recent topsoil material added to the pile. A patch of Canada thistle was <br />observed on the south east side of the stockpile and will need to be treated. <br />DOCUMENTS RECEIVED: Map of development drilling locations. <br />OTHER (SPECIFY) <br />Enclosure: 1.) August 18 to 20, 2014 Inspection; Development Drill Hole Map, Sheets 1 and 2 <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 5 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.