My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-20_HYDROLOGY - M2013040
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2013040
>
2014-08-20_HYDROLOGY - M2013040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 2:56:37 AM
Creation date
8/25/2014 12:14:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013040
IBM Index Class Name
Hydrology
Doc Date
8/20/2014
Doc Name
Stormwater Permit
From
Jean Cowman and Rich Fretterd
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
TCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATION TO DISCHARGE UNDER <br /> °'.C CDPS GENERAL PERMIT COR340000 <br /> STORMWATER ASS <br /> y OCIATED WITH SAND&GRAVEL MINING&PROCESSING <br /> ft <br /> *r 7s* Certification Number:COR341719 <br /> Colorado Department This Certification to Discharge specifically authorizes: <br /> of publics <br /> and Environment Richard Fretterd <br /> to discharge stormwater from the facility identified as <br /> Godsend lode claim <br /> to: <br /> Crystal Creek-South Platte River <br /> Facility Located at: ECR 3 and CR 51 near FS201 uninc Teller County,CO <br /> Center Point Latitude 39.022221 Longitude-105.294239 <br /> All discharges must comply with the lawful requirements of federal agencies municipalities,counties,drainage districts and other <br /> local agencies regarding any discharges to storm drain systems,conveyances,or other water courses under their jurisdiction. <br /> Monitoringt Requirements <br /> Monitoring Sample <br /> Parameter Units Benchmark Values Rationale Frequency Type <br /> Total Suspended Solids(TSS) mg/L 100 EPA Benchmarks Quarterly Grab <br /> Additional Monitoring Reauirements <br /> On the effective date of this certification,the Godsend lode claim facility is subject to the monitoring requirements discussed <br /> below at each discharge point of stormwater from the facility. <br /> Monitoring frequency:The permittee must collect samples of stormwater discharge from the facility once per quarter unless <br /> otherwise directed by the Division. <br /> Measurable Storm Event: For this certification,monitoring is only required once per quarter,regardless of the number of <br /> measureable storm events. However,if additional samples are collected during the quarter,these additional samples must also <br /> be included in the DMR summary as described below. <br /> • Rain event.Permittees must conduct monitoring,as specified in the Monitoring Requirements table above,on a storm event <br /> that results in an actual discharge from the facility(measurable storm event),and that follows the preceding measurable <br /> storm event by at least 72 hours(3 days). <br /> • Snowmelt event.The permittee must conduct snowmelt monitoring at a time when a measurable discharge occurs from the <br /> facility. <br /> Storm Event Information <br /> • Rain event.The permittee must document the information below for each monitored event. <br /> i. The date,time of the start of the discharge,time of sampling,duration(in hours)of the rainfall event,and magnitude(in <br /> inches)of the storm event sampled; <br /> ii. The duration between the storm event sampled and the end of the most recent storm event that produced a discharge. <br /> • Snowmelt monitoring.The permittee must document the date of the sampling event for each monitored Snowmelt event. <br />
The URL can be used to link to this page
Your browser does not support the video tag.