My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-21_REVISION - M1999042
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999042
>
2014-08-21_REVISION - M1999042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:13:01 PM
Creation date
8/22/2014 8:45:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999042
IBM Index Class Name
REVISION
Doc Date
8/21/2014
Doc Name
Request for technical revision TR03
From
Avalanche Creek Marble and Alabaster LLC
To
DRMS
Type & Sequence
TR3
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />The 2013 Decision Notice states "ESC shall furnish abond to insure Rill performance of <br />reclamation and mitigation ineasures on National Forest System lands based on the approved <br />reclamation plan ". <br />I will approve your Plan of Operations when I have written confirmation front the State that you <br />are in the process of updating your reclamation permit to include "native" grass and shrubs <br />sources. <br />You have provided clarification of your authorized agent, Robert Congdon, and included <br />additional language in Sections VI tlnu VIII of the Plan of Operations for Mining Activities on <br />National Forest System Lands farm FS- 2800 -5. <br />Mr. McCoy's letter dated July 2 assumes the State has bonded for the secondary escapeway and <br />the water well as depicted on the site map shown on your reclamation permit M 1999 -042 issued <br />January 2000. The FS is relying on individual line items prepared by the State inspector when <br />reviewing the State reclamation bond to determine the adequacy of your bond. If the escapeway <br />and water well are shown as line items in the bond calculation then it is covered, if it is not <br />included in the State bond calculation then it is not covered in your existing reclamation bond. <br />As previously stated and like the road re- route, the secondary escapeway and water well are <br />currently not bonded. Before construction could begin on the secondary escapeway or water <br />well, additional bonding with the State of Colorado would be required. <br />If you have questions-or need further assistance, please contact David Francomb at (970) 963- <br />2266 or Olivia Garcia at (970) 945 -3220. <br />Sincerely, <br />,I r)744K <br />KARENSCHROYER <br />District Ranger <br />
The URL can be used to link to this page
Your browser does not support the video tag.