Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br /> Annual Reclamation Report for the Year 2014 <br /> Shaffers Crossing Quarry MLRB 1979-208 Elk Creek Sand&Gravel LLC <br /> mine name permit# Permittee <br /> ,address: 12997 South Elk Creek Road, Pine CO 80470 <br /> This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br /> by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br /> reclamation monitoring data as required by the approved permit. The location of the acreage reported <br /> under each land status category and year of seeding (if applicable)should be clearly and accurately <br /> identified on a map included with the report. <br /> Last Years This Calendar <br /> Land Status Category Cumulative Total Year Cumulative Total ' <br /> Acres disturbed .71 + .67 = 1.38 <br /> Acres backftlled and graded .13 + .13 = .26 <br /> Acres to soiled .12 + .9 = 1.10 <br /> Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br /> each cateqory below. Do not include acres that have achieved final, Phase III release. <br /> Last Years This Greater <br /> Cumulative This <br /> Cumulative 10 years or than 10 <br /> Total year Tota I ' less years' <br /> Acres seeded' •5 + 0.00 - 0.55 - 1.55 + 0 <br /> *include, if necessary, a description of any augmented seeding or cultural practices <br /> For the Entire Life of Mine, the total number of acres disturbed 9.9 and the total number of acres: <br /> Phase I released 0 Phase II released 0 Phase III released 0 <br /> For Mines in Permanent Cessation: <br /> Total acreage in facilities subject to reclamation but yet to be completed NA <br /> For Government Performance and Results Act <br /> Acreage in long-term mining or reclamation facilities z 9.9 <br /> Acreage in active mining areas 37.5 <br /> '(exclude acres where Phase III release has been achieved) <br /> 2 Includes haul and access roads;temporary dams and impoundments;permanent dams and impoundments;diversion and <br /> collector ditches,water and air monitoring sites;topsoil stockpiles;overburden stockpiles;repair,storage and construction areas; <br /> office area,repair shops,and parking;coal stockpiles,loading,and processing areas;railroads;coal conveyors;nonbackfilled and <br /> graded areas of refuse piles,coal mine waste anpourKtmerts,head-o€hoAow Ms,and valley fi#s;ver4itabon shafts and entryways; <br /> and noncoal waste disposal area(garbage dumps and coal combustion by-products disposal areas). <br /> 3 Includes pits,topsoil stripped areas in advance of pits,and spoil not bac filled and graded <br />