Laserfiche WebLink
RECEIVED <br /> ECtAMATION <br /> � ..A�6 SAFI1f Y <br /> it.�'.. � �► ' �l�+�lalsi� �reseed�d <br /> e <br /> R <br /> 01 <br /> lilt coma <br /> /P <br /> Appendix A-SWMP Site Map <br /> a. Mining Site boundaries <br /> b.Access&Haul Roads <br /> C.Stommmler outfalls(1 each PROPOSED)and proposed drainage area of the stormwater <br /> outfall(WA for this analysis).There is no ark*x*W stommater outfall at this time per the Study <br /> conducted by W&EST(Catherine Kraeger-Rovey,P ft.)Please we attached report, <br /> d.An estimate of the direction of flow PROPOSED,ANTICIPATED <br /> e. Materials handling area(1 each) <br /> f. Each existing structural control measure to reduce pollutants in stommater runoff <br /> PROPOSED,ANTICIPATED(Detention pond on South end of Property feeding into 36"CMP- <br />