My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-19_REVISION - M2008078
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2014-08-19_REVISION - M2008078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:13:01 PM
Creation date
8/20/2014 3:46:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
8/19/2014
Doc Name
Request for technical revision TR03
From
GP Aggregates, LLC
To
DRMS
Type & Sequence
TR3
Email Name
AME
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
id I <br /> J&T Consulting, Inc. <br /> August 15, 2014 <br /> Ms. Amy Eschberger <br /> Environmental Protection Specialist <br /> State of Colorado <br /> Division of Reclamation, Mining, & Safety <br /> 1313 Sherman Street— Room 215 <br /> Denver, CO 80203 <br /> RE: GP Aggregates, LLC. — West Farm Pit— Technical Revision No. 3 Request <br /> File No. M-2008-078 <br /> Dear Ms. Eschberger, <br /> GP Aggregates, LLC. (GP) requests a revision to their existing permit to address the following 2 items: <br /> 1. Exhibit C— Pre-Mining/Mining Plan <br /> a. Revision of the mine phasing. <br /> 2. Exhibit L— Reclamation Costs <br /> a. Revision of the financial warranty required for the reclamation of each phase of mining. <br /> Detailed descriptions of these revisions are in the following sections. <br /> Exhibit C—Pre-Mining/Mining Plan <br /> Revision of mine phasing <br /> Phase 1A is being revised to include all of the following: <br /> 1. Surface mining of the top 10 to 12 feet of material above the groundwater table of the Phase <br /> 1 area. <br /> 2. The disturbance and stockpiling of materials in the Phases 2 through 4 areas. <br /> 3. The disturbance and stockpiling of materials in the Phase 13 area. <br /> 4. The disturbance and stockpiling of materials in the temporary topsoil/overburden stockpile <br /> area in the southeast corner of the mine. <br /> Exhibit L - Reclamation Costs <br /> GP requests a reduction of the required financial warranty for the slurry wall liner to 20% of the cost <br /> to install the slurry wall under the regulated construction option detailed in the "Guide to <br /> Specification Preparation for Slurry Walls and Clay Liners as a Component of a Colorado Mined <br /> Land Reclamation Permit", and a revision to the financial warranty required for the reclamation of <br /> each phase of mining to reflect the revised mine phasing. <br /> 1. GP has recently completed the construction of the first section of slurry wall around Phases <br /> 1 through 4, with leak testing of this section of the wall to occur in the near future. Attached <br /> V 305 Denver Avenue, Suite D•Fort Lupton,CO 80621 •Ph:303-857-6222•Fax:303-857-6224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.