Laserfiche WebLink
GP Aggregates LLC <br /> 1 Jszl' Consulting, Inc. <br /> West Farm Pit <br /> 8/15/2014 <br /> Reclamation Bond Quantities and Costs <br /> 2014 jtT Coosaltinit,Inc. <br /> Phase 16(11.43 acres) <br /> [Reclamation Operation Quantity Unit Unit Cost Cost I <br /> Active Mining Area <br /> Credit 20%Cost of Slurry Wall Required to Close Phases 14-15(50'avg (4,666) If $ 30 $ (139,980) <br /> Credit for Topsoil Area Above Water Required for Phases 14-15 (4.2) ac $ 2,000 $ (8,481) <br /> Credit for Revegetated Area Above Water Required for Phases 14-15 (4.2) ac $ 1,000 $ (4,241) <br /> 20%Cost of Slurry Wall Required to Close Phases 14-16(45'avg Depth) , 5,866 If $ 27 $ 158,382 <br /> Topsoil Area Above Water Required for Phases 14-16 5.3 ac $ 2,000 $ 10,597 <br /> Revegetate Area Above Water Required for Phases 14-16 5.3 ac $ 1,000 $ 5,298 <br /> Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 24,076 <br /> Overhead and Profit Cost(12.60%) $ 3,034 <br /> Contract Cost $ 27,109 <br /> Project Management(9.25%) $ 2,227 <br /> (Additional Financial Warranty Required For Phase 16 $ 29,336 <br /> Phase 17(11.13 acres) <br /> !Reclamation Operation Quantity Unit Unit Cost Cost I <br /> Active Mining Area <br /> Credit 20%Cost of Slurry Wall Required to Close Phases 14-16(45'avg (5,866) If $ 27 $ (158,382) <br /> Credit for Topsoil Area Above Water Required for Phases 14-16 (5.3) ac $ 2,000 $ (10,597) <br /> Credit for Revegetated Area Above Water Required for Phases 14-16 (5.3) ac $ 1,000 $ (5,298) <br /> 20%Slurry Wall Required to Close Phases 14-17(45'avg Depth) 5,776 If $ 27 $ 155,952 <br /> Topsoil Area Above Water Required for Phases 14-17 5.2 ac $ 2,000 $ 10,444 <br /> Revegetate Area Above Water Required for Phases 14-17 5.2 ac $ 1,000 $ 5,222 <br /> Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ (159) <br /> Overhead and Profit Cost(12.60%) $ (20) <br /> Contract Cost $ (179) <br /> Project Management(9.25%) $ (15) <br /> (Additional Financial Warranty Required For Phase 17 $ (193)1 <br /> Phase 18(11.52 acres) <br /> 'Reclamation Operation Quantity Unit Unit Cost Cost I <br /> Active Mining Area <br /> Credit 20%Cost of Slurry Wall Required to Close Phases 5-17(45'avg (14,278) If $ 27 $ (385,506) <br /> Credit for Topsoil Area Above Water Required for Phases 14-17 (5.2) ac $ 2,000 $ (10,444) <br /> Credit for Revegetated Area Above Water Required for Phases 14-17 (5.2) ac $ 1,000 $ (5,222) <br /> 20%Cost of Slurry Wall Required to Close Phases 5-18(45'avg Depth) 11,206 If $ 27 $ 302,562 <br /> Topsoil Area Above Water Required for Phase 14-18 6.7 ac $ 2,000 $ 13,442 <br /> Revegetate Area Above Water Required for Phase 14-18 6.7 ac $ 1,000 $ 6,721 <br /> Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ (75,948) <br /> Overhead and Profit Cost(12.60%) $ (9,569) <br /> Contract Cost $ (85,518) <br /> Project Management(9.25%) $ (7,025) <br /> 'Additional Financial Warranty Required For Phase 18 $ (92543)1 <br /> I Total Financial Warranty Required For All Phases $ 947,930 I <br /> 7 of 7 <br />