Laserfiche WebLink
GP Aggregates LLC <br /> 1 J&T Consulting, Inc. <br /> West Farm Pit <br /> 8/1512014 <br /> Reclamation Bond Quantities and Costs <br /> ©2014 J&T Co*ui1ttLfl [no. <br /> Phase 13(11.61 acres) <br /> 'Reclamation Operation Quantity Unit Unit Cost Cost I <br /> Active Mining Area <br /> Credit 20%Cost of Slurry Wall Required to Close Phases 5-12(60'avg (6,684) If $ 38 $ (253,992) <br /> Credit for Topsoil Area Above Water Required for Phases 1-12 (8.5) ac $ 2,000 $ (17,051) <br /> Credit for Revegetated Area Above Water Required for Phases 1-12 (8.5) ac $ 1,000 $ (8,525) <br /> Credit for Scarifying Ground in Disturbed Area (11.6) ac $ 200 $ (2,322) <br /> Credit for Topsoil Placement in Disturbed Area (11.6) ac $ 2,000 $ (23,220) <br /> Credit for Revegetate Disturbed Area (11.6) ac $ 1,000 $ (11,610) <br /> 20%Cost of Slurry Wall Required to Close Phases 5-13(60'avg Depth) 8,502 If $ 38 $ 323,076 <br /> Topsoil Area Above Water Required for Phases 1-13 10.1 ac $ 2,000 $ 20,252 <br /> Revegetate Area Above Water Required for Phases 1-13 10.1 ac $ 1,000 $ 10,126 <br /> Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 39,234 <br /> Overhead and Profit Cost(12.60%) $ 4,943 <br /> Contract Cost $ 44,177 <br /> Project Management(9.25%) $ 3,629 <br /> (Additional Financial Warranty Required For Phase 13 $ 47,806 <br /> Phase 14(11.56 acres) <br /> (Reclamation Operation Quantity Unit Unit Cost Cost I <br /> Active Mining Area <br /> 20%Cost of Slurry Wall Required to Close Phase 14(50'avg Depth) 2,895 If $ 30 $ 86,850 <br /> Topsoil Area Above Water Required for Phase 14 2.7 ac $ 2,000 $ 5,317 <br /> Revegetate Area Above Water Required for Phase 14 2.7 ac $ 1,000 $ 2,658 <br /> Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 97,325 <br /> Overhead and Profit Cost(12.60%) $ 12,263 <br /> Contract Cost $ 109,588 <br /> Project Management(9.25%) $ 9,003 <br /> (Additional Financial Warranty Required For Phase 14 $ 118,591 <br /> Phase 15(11.52 acres) <br /> 'Reclamation Operation Quantity Unit Unit Cost Cost <br /> Active Mining Area <br /> Credit 20%Cost of Slurry Wall Required to Close Phase 14(50'avg Depth) (2,895) If $ 30 $ (86,850) <br /> Credit for Topsoil Area Above Water Required for Phase 14 (2.7) ac $ 2,000 $ (5,317) <br /> Credit for Revegetated Area Above Water Required for Phase 14 (2.7) ac $ 1,000 $ (2,658) <br /> 20%Cost of Slurry Wall Required to Close Phases 14-15(50'avg Depth) 4,666 If $ 30 $ 139,980 <br /> Topsoil Area Above Water Required for Phases 14-15 4.2 ac $ 2,000 $ 8,481 <br /> Revegetate Area Above Water Required for Phases 14-15 4.2 ac $ 1,000 $ 4,241 <br /> Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 60,377 <br /> Overhead and Profit Cost(12.60%) $ 7,607 <br /> Contract Cost $ 67,984 <br /> Project Management(9.25%) $ 5,585 <br /> (Additional Financial Warranty Required For Phase 15 $ 73,569 I <br /> 6 of 7 <br />