Laserfiche WebLink
amec ,' <br /> II) Storm Water Management <br /> Best Management Practices(BMPs)are being performed. <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; underground working remediation and confirmatory drilling; secondary underdrain <br /> installation; nuclear moisture and density testing; geomembrane deployment, testing and repair <br /> monitoring and certification; subgrade and SLF inspection and certification; DCF, LVSCF, OF and <br /> SSF sampling; and Highway 67 ditch construction and striping. <br /> II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> ➢ Drain Cover Fill sample numbers DCF-102 and 103(control samples) <br /> ➢ Low Volume Solution Collection Fill samples, LVSCF 9-R, 10-R, 11-R, and 12-R (record samples) <br /> Select Structural Fill sample SSF-15R(record sample) <br /> Y Underdrain Fill UF12-R(record sample) <br /> General Proiect Items <br /> Meetings and Discussions: <br /> Y Weekly Contractor Meeting—August 6, 2014 (CC&V, AMEC, Ames) <br /> ➢ CC&V contractor H&S meeting August 7, 2014 <br /> > ECA daily safety meetings <br /> ➢ Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CCBV: Daily updates, reporting and scheduling are some of the tasks occurring between CC&V Projects, <br /> AMEC, and Ames. <br /> Miscellaneous: <br /> r Drain cover fill crusher processing continued <br /> ➢ The ditch east of the MSE wall and adjacent to Highway 67 was graded and lined with topsoil. <br /> Low volume material was placed between the asphalt and the concrete ditch next to the MSE wall <br /> and stripe painting occurred on the Highway 67 alignment and overlook parking area. <br /> Deliveries: 60 rolls of 80-mil MSDS were delivered to ECA. <br /> Submitted by: Eric Lorenson Date: August 12, 2014 <br /> Reviewed by:,_ Date:August 12, 2014 <br /> Andrea Meduri-a <br /> Project Engineer <br /> Phone: 719-689-2986 <br /> Projects Approved <br /> r� j <br /> Approved By: i �� Date: <br /> Approved By: �� i l ,r'. .— Date: <br /> M4.08.09-MLE2 WEEKLY FINAL.DOCX Page 4 of 7 <br />