My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-07_PERMIT FILE - C1981014A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981014
>
2014-08-07_PERMIT FILE - C1981014A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:32 PM
Creation date
8/19/2014 2:16:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
8/7/2014
Section_Exhibit Name
4.05 Hydrologic Balance
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EFCI to evaluate and determine the success of mine plans, drainage and <br />sediment control facilities, and reclamation for the purpose of minimizing <br />disturbance to the hydrologic balance and assuring the success of proposed <br />postmining land uses. <br />Monitoring data collected over the Water Year from January through <br />December is submitted to the CDRMS on or before February 15 in the year <br />immediately following the water year. <br />Since EFCI reports discharges in accordance with its NPDES permits on a quarterly <br />basis, EFCI will notify the CMLRD of NPDES report filings in compliance with Part <br />4.05.13 (2) (ii) <br />(b). EFCI will also notify the CDRMS of any possible non - complying discharges <br />within five (5) days of receiving analytical results indicating possible <br />noncompliance. If non - compliance with a NPDES permit effluent limitation does <br />occur, EFCI will forward the analytical results concurrently with the written <br />notification of noncompliance. <br />EFCI will continue surface and groundwater monitoring activities after completion of <br />reclamation operations to document restoration of pre- mining hydrologic <br />characteristics. Monitoring will be discontinued when untreated surface runoff <br />meets applicable effluent limitations and the CDRMS approves removal of <br />drainage and sediment control structures. <br />4.05.14 TRANSFER OF WELLS <br />EFCI currently has no plans to transfer any exploration boreholes or monitoring <br />wells for subsequent use as water wells. <br />MR -64 4.05 -26 Revised: 7 -31 -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.