Laserfiche WebLink
EFCI to evaluate and determine the success of mine plans, drainage and <br />sediment control facilities, and reclamation for the purpose of minimizing <br />disturbance to the hydrologic balance and assuring the success of proposed <br />postmining land uses. <br />Monitoring data collected over the Water Year from January through <br />December is submitted to the CDRMS on or before February 15 in the year <br />immediately following the water year. <br />Since EFCI reports discharges in accordance with its NPDES permits on a quarterly <br />basis, EFCI will notify the CMLRD of NPDES report filings in compliance with Part <br />4.05.13 (2) (ii) <br />(b). EFCI will also notify the CDRMS of any possible non - complying discharges <br />within five (5) days of receiving analytical results indicating possible <br />noncompliance. If non - compliance with a NPDES permit effluent limitation does <br />occur, EFCI will forward the analytical results concurrently with the written <br />notification of noncompliance. <br />EFCI will continue surface and groundwater monitoring activities after completion of <br />reclamation operations to document restoration of pre- mining hydrologic <br />characteristics. Monitoring will be discontinued when untreated surface runoff <br />meets applicable effluent limitations and the CDRMS approves removal of <br />drainage and sediment control structures. <br />4.05.14 TRANSFER OF WELLS <br />EFCI currently has no plans to transfer any exploration boreholes or monitoring <br />wells for subsequent use as water wells. <br />MR -64 4.05 -26 Revised: 7 -31 -14 <br />