My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-13_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-08-13_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 2:26:02 PM
Creation date
8/14/2014 8:59:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/13/2014
Doc Name
Weekly CQA Report: Week ending 08/02/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO, <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF) & HWY 67 RE-ALIGNMENT MONITORING WEEKLY REPORT <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: August 2, 2014 <br /> Location: Cripple Creek&Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 07.27.2014 through 08.02.2014 <br /> Days S M T W T F S <br /> D D D D D/W D D <br /> Work Shifts <br /> D=Day Shift N=Night Shift W=Weather day <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 45°F to 68°F Cloud Cover: Overcast to partly cloudy <br /> Precipitation: Rain: Sun, Mon, Tues, Wed, <br /> Lows: 44°F to 48°F Thurs, Fri, Sat. <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF(PSSA, Phase 1 and 2) <br /> Topsoil/Overburden Stripping: None. <br /> Tree Grubbing and Clearing, Chipping: None. <br /> Production Drilling: No production drilling was performed within the VLF limits. <br /> Production Blasting: No production blasting took place within the VLF. <br /> Structural Fill: <br /> All structural fill material discussed below was placed and compacted per the technical <br /> specifications. <br /> A John Deere 850 excavator loaded Cat 740 haul trucks with stockpiled structural fill material <br /> located at ADR haul road station 60+00. Cat dozers were cutting material west of the Anaconda <br /> Mine Complex and from the Ball Mill crossing area. A Cat 345 excavator loaded Cat 740 haul <br /> trucks with excess material graded from the ADR haul road near station 12+00. Material from <br /> these areas was transported upslope of the ADR haul road between stations 65+00 to 75+00, <br /> and upslope of stations J12+00 to J14+00 where it was placed as structural fill by Cat dozers. <br /> 2014.08.02-mle2 weekly final Pace 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.