Laserfiche WebLink
May Day Mine <br /> Bond Estimate <br /> May Day-Idaho Mine Complex <br /> M-1981-185 <br /> The Access Road will remain after mining-including access to Incas Mine Site located east of the Chief Portal(See Attachment A) <br /> Ore will not be processed within the May Day-Idaho Mine Complex <br /> Buildings will be removed at cost of material(material recycled costs exceed of cost to remove or demolish) <br /> Mine equipment will be buried underground(approved by the Land Owner-Mr.David Tippit) <br /> Access road to the Idaho Mill will remain to support post mine land uses <br /> Existing Bond 12/7/2009 Comments <br /> 1 Demolish and Remove mine Structures $ 25,510.00 <br /> Dump Fees at Land Fill $ 65,390.00 <br /> 2 Close 4 portals $ 14,224.00 <br /> 3 Walk Excavator from CR124 $ 108.00 <br /> 4 Highwal Reduction at Level 3 $ 118.00 <br /> 4 Contour Dump at Level 3 $ 118.00 <br /> 6 Walk Excavator Level 3 to Level 1 $ 108.00 <br /> 7 Highwal Reduction at Level 1 $ 527.00 8 acres @$2,864 <br /> 8 Contour Dump at Level 1 $ 307.00 <br /> 9 Walk Excavator Level 1 to Level 2 $ 27.00 <br /> 10 Highwal)Reduction Level 2 $ 264.00 <br /> 11 Contour Dump at Level 2 $ 307.00 <br /> 12 Walk Excavator from Level 2 to CR124 $ 54.00 8 acres @$1,382.50 acre <br /> 13 Revegetate four areas affected land $ 7,722.00 <br /> 14 Mobilize/Demobilize $ 1,538.00 <br /> Total $ 116,322.00 <br /> Proposed Bond <br /> 1 Demolish and Remove mine Structures $ - Salvaged at no cost to reclamation or bond <br /> la Dump Fees at Land Fill $ - Savaged at no cost to reclamation or bond <br /> 2 Close 4 portals $ 14,224.00 <br /> 3 Walk Excavator from CR124 $ 108.00 <br /> 4 Highwal Reduction at Level 3 $ 118.00 <br /> 4 Contour Dump at Level 3 $ 118.00 <br /> 6 Walk Excavator Level 3 to Level 1 $ 108.00 <br /> 7 Highwal Reduction at Level 1 $ 527.00 <br /> 8 Contour Dump at Level 1 $ 307.00 <br /> 9 Walk Excavator Level 1 to Level 2 $ 27.00 <br /> 10 Highwall Reduction Level 2 $ 264.00 <br /> 11 Contour Dump at Level 2 $ 307.00 <br /> 12 Walk Excavator from Level 2 to CR124 $ 54.00 <br /> 13 Revegetate four areas affected land $ 7,722.00 <br /> 14 Mobilize/Demobilize $ 1,538.00 <br /> Total $ 25,422.00 <br />