Laserfiche WebLink
B. Water Quality. State how applicable state and federal water quaNy standards will be met Describe measures or <br /> management practices to be used to minimize water quaRy Impacts and meet applicable standards. <br /> f. State whether water is to be used in the operation, and describe the quantity,source,methods and design of diversions, <br /> storage,use,dspossal,and treatment foci ies. Include assumptions for sizing water conveyance or storage facilities. <br /> 2. Describe methods to control erosion and surface water runoff from aft disturbed areas,including waste and taifings dumps. <br /> 3. Describe proposed surface water and groundwater quality monitoring,if required,to demonstrate compliance with federal or <br /> state water quality standards. <br /> 4. Describe the measures to be used to minimize potential water quality impacts during seasonal closures,or for a temporary <br /> cessation of operations. <br /> 5. if land application is proposed for waste water disposal,the location and operation of the land application system must be <br /> described. Also describe how vegetation,sal and surface and groundwater quality wfR be protected if land application is <br /> used. <br /> Limited amounts of water will be used,We have a portable water tanks to bring water to site to run thru a recirculating <br /> screening station with no water outside the provided reservoir.Water bars will be placed around screening station. <br /> C. Solid Wastes. Describe the quantity and the physical and chemical characteristics of solid waste produced by the operation. <br /> Describe how the wastes will be disposed of including location and design of facilities,or treated so as to minimize adverse impacts. <br /> None <br /> D. Scenic Values. Describe protection of scenic values such as screening,slash disposal,or timely reclamation. <br /> The proposed operation will be small in scope and size and will be reclaimed as work is completed in each area.The <br /> scope of work is less than 1600 sq.ft,we will also reclaim area's wnere we have been hit by claim jumpers last season <br /> which will leave the site in better condition after our work is completed. <br /> pfmore space is needed to fill on(a block of infoomadon,use additional shed:and attach form) <br /> -4- <br />