Laserfiche WebLink
C. Project Description. Describe aN aspects of the operation including mirft mNft and exptorafion methods, materkds, <br /> equpnenf, woAhme, cormirucaon and operation schedule,power requirements,how ciearing wifl be accornpifshed, topsorl <br /> stockpile, waste rock placement, taifings disposal, proposed number of drRm*s and depth, depth of proposed suction <br /> dredging,and how gravels wY#be replaced, etc. Calculate production rates of ore. include justification and calculations for <br /> sWng pond capacities,and the size of runoff diversion channels. <br /> We will access the site using existing roads.We will then excavate the zone of attest with the excavator,locate crystal <br /> gem pockets then carefully screen out any valuable gems and minerals.AN pockets found will be removed from the <br /> property.The disturbed area will be then reclaimed.This will require a working crew of 3 or 4 persons,working as <br /> weather permits 7 days a week.We anticipate the work and reclamation to take 3 weeks and will contact Chris Welker of <br /> the Forest Service for inspection. <br /> D. Equipment and Vehicles. Llescnbe that which is proposed for use In your operation(Examples:drip,dozer,wash plant,mid,etc.). include., <br /> sizes,rapacity,bequency of use,etc <br /> (1)Volvo,Low Clearance, 15,000 excavator,2 trucks,1 ATV,portable screens <br /> E. Structures. twA)de information about fixed or portabie structures or faalfies planned for the operation. Show bc6ons on the <br /> map. Include such things as living quarters,storage sheds,mid bulldings,thkkener tanks,fuel storage,powder magazines, <br /> pipelines,water diversions,traders,sanitation facilities including sewage disposal,eta include engineering design and geotechnical <br /> information for project hacilftles,justification and calculations for sizing of tanks,pipelines and water diversions,efc. <br /> None. <br /> V. ENVIRONMENTAL PROTECTION MEASURES(SEE 36 CFR 228.8) <br /> A Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a burning pemxt for slash disposal <br /> or dust abatement on roads. <br /> We do not anticipate creating any air quality issues with the limited scope of our operations. <br /> (If more spate is needed to flu out a block of lnformadon,use additiond sherts and attach form) <br /> -3- <br />