My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-04_PERMIT FILE - M2014030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014030
>
2014-06-04_PERMIT FILE - M2014030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 12:16:09 AM
Creation date
8/13/2014 9:32:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014030
IBM Index Class Name
Permit File
Doc Date
6/4/2014
Doc Name
USFS POO
From
USFS
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Project Description. Describe aN aspects of the operation including mirft mNft and exptorafion methods, materkds, <br /> equpnenf, woAhme, cormirucaon and operation schedule,power requirements,how ciearing wifl be accornpifshed, topsorl <br /> stockpile, waste rock placement, taifings disposal, proposed number of drRm*s and depth, depth of proposed suction <br /> dredging,and how gravels wY#be replaced, etc. Calculate production rates of ore. include justification and calculations for <br /> sWng pond capacities,and the size of runoff diversion channels. <br /> We will access the site using existing roads.We will then excavate the zone of attest with the excavator,locate crystal <br /> gem pockets then carefully screen out any valuable gems and minerals.AN pockets found will be removed from the <br /> property.The disturbed area will be then reclaimed.This will require a working crew of 3 or 4 persons,working as <br /> weather permits 7 days a week.We anticipate the work and reclamation to take 3 weeks and will contact Chris Welker of <br /> the Forest Service for inspection. <br /> D. Equipment and Vehicles. Llescnbe that which is proposed for use In your operation(Examples:drip,dozer,wash plant,mid,etc.). include., <br /> sizes,rapacity,bequency of use,etc <br /> (1)Volvo,Low Clearance, 15,000 excavator,2 trucks,1 ATV,portable screens <br /> E. Structures. twA)de information about fixed or portabie structures or faalfies planned for the operation. Show bc6ons on the <br /> map. Include such things as living quarters,storage sheds,mid bulldings,thkkener tanks,fuel storage,powder magazines, <br /> pipelines,water diversions,traders,sanitation facilities including sewage disposal,eta include engineering design and geotechnical <br /> information for project hacilftles,justification and calculations for sizing of tanks,pipelines and water diversions,efc. <br /> None. <br /> V. ENVIRONMENTAL PROTECTION MEASURES(SEE 36 CFR 228.8) <br /> A Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a burning pemxt for slash disposal <br /> or dust abatement on roads. <br /> We do not anticipate creating any air quality issues with the limited scope of our operations. <br /> (If more spate is needed to flu out a block of lnformadon,use additiond sherts and attach form) <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.