Laserfiche WebLink
TEST PIT NUMBER TP RWGBTP-01 <br /> Wildcat PAGE 1 OF 1 <br /> Mining 4orporatior <br /> i •—;. —,vr, t Rt t,If? <br /> CLIENT Wildcat Mining Corporation PROJECT NAME New Access Road <br /> PROJECT NUMBER Geotech-001 PROJECT LOCATION Hesperus,Colorado <br /> DATE STARTED 1/13/12 COMPLETED 1/13/12 GROUND ELEVATION 8635.3 ft TEST PIT SIZE Tx 5' <br /> EXCAVATION CONTRACTOR Wildcat Mining GROUND WATER LEVELS: <br /> EXCAVATION METHOD Backhoe �Z AT TIME OF EXCAVATION 5.00 ft/Elev 8630.30 ft <br /> LOGGED BY David McLay,P.E. CHECKED BY J.Erich Rauber,P.E. AT END OF EXCAVATION ---No water level measurement taken <br /> NOTES AFTER EXCAVATION ---No water level measurement taken <br /> w <br /> a. <br /> = F Lu <br /> w -1 2 TESTS C6 Q-O MATERIAL DESCRIPTION <br /> a <br /> o D J <br /> Q Z <br /> 0.0 <br /> (ML)Brown fine sandy Silt <br /> ML <br /> GB w=30.3%,LL=33, <br /> 5'-2. PI=5 <br /> 2.5 <br /> �13.0 8632.3 <br /> Brown fine sandy silty Cobbles and Boulders(rounded) <br /> a 5'0 15.0 _ 8630.3 <br /> Bottom of test pit at 5.0 feet. <br /> a <br /> 0 <br /> r <br /> a <br /> 'm <br /> L) <br /> U <br /> w <br /> O <br /> ry <br /> a <br /> F <br /> z <br /> c7 <br /> W <br /> w <br /> J <br /> w <br /> Q <br /> 0 <br /> 0 <br /> Q <br /> a_ <br /> CD <br /> U <br /> v <br /> M <br /> o_ <br /> N <br /> N <br /> M <br /> H <br /> t] <br /> in <br /> Q <br /> J <br /> C] <br /> H <br /> z <br /> _Z <br /> J <br /> J <br /> w> <br /> a <br /> x <br /> m <br /> J <br /> w <br /> z <br /> w <br />