Laserfiche WebLink
TEST PIT NUMBER TP RWBUTP-02 <br /> Wildcat PAGE 1 OF 1 <br /> Mining Corporator <br /> i t N1 4tA <br /> CLIENT Wildcat Mining Corporation PROJECT NAME New Access Road <br /> PROJECT NUMBER Geotech-001 PROJECT LOCATION Hesperus Colorado <br /> DATE STARTED 1/31/12 COMPLETED 1/31/12 GROUND ELEVATION 8690.49 ft TEST PIT SIZE Tx 4' <br /> EXCAVATION CONTRACTOR Wildcat Mining GROUND WATER LEVELS: <br /> EXCAVATION METHOD Backhoe AT TIME OF EXCAVATION ---No Free Water Encountered <br /> LOGGED BY David McLav P.E. CHECKED BY J.Erich Rauber, P.E. AT END OF EXCAVATION ---No Free Water Encountered <br /> NOTES AFTER EXCAVATION ---No Free Water Encountered <br /> w <br /> >- U <br /> i­_U.1 TESTSUj <br /> g AND U 0-0 MATERIAL DESCRIPTION <br /> Li Uj <br /> 0-Z REMARKS <br /> 0.0 <br /> (GW)Red-brown clayey sandy Gravel,Cobbles,and Boulders <br /> GB w=12.7% •`~ <br /> V-2' �'•�: <br /> GW <br /> -hard digging <br /> 2.5 below frost(1 foot) �• <br /> �. a <br /> �'•1. 3.5 <br /> 8687.0 <br /> Bottom of test pit at 3.5 feet. <br /> a <br /> c7 <br /> r <br /> Q <br /> 0 <br /> a <br /> f <br /> U <br /> W <br /> O <br /> x <br /> a <br /> F <br /> z <br /> 9 <br /> U) <br /> w <br /> J <br /> LL <br /> Q <br /> U' <br /> a_ <br /> U <br /> v <br /> m <br /> o_ <br /> N <br /> za <br /> N <br /> M <br /> F <br /> m <br /> Q <br /> J <br /> f- <br /> z <br /> _Z <br /> J <br /> J <br /> >W <br /> a <br /> x <br /> m <br /> w <br /> z <br /> w <br /> 0 <br />